Non-catalytic unit
Table of Contents

Advertisement

2. After locating the center of the hole install the ceiling support box, chimney, flashing and
rain cap using listed chimney only. Only use pipe listed in this manual.
REFER TO CHIMNEY MANUFACTURER'S INSTRUCTIONS FOR ASSEMBLY AND
DISASSEMBLY OF CHIMNEY PARTS.
TIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER AIR SPACING
REQUIRED.
3. Add additional pipe until both of the following are met:
(a) Chimney pipe is 3 feet higher than roof at the point where it penetrates the roof.
(b) Chimney pipe height is at least 2 feet higher than any part of the roof within 10 feet of
the chimney. (See Page 43 Figure 38.)
4. Next, install a New Buck Cast Collar Part # MA6CHIMCNB to the flue of the heater.
(See Page 40 Figure 34).
5. Using double wall chimney connector, connect the heater to the chimney by following
manufacturer's installation instructions exactly. (See Figure 39.)
CAUTION
BE SURE TO FOLLOW CHIMNEY INSTRUC-
Figure 4.
Figure 39.
CEILING
NEW BUCK
44
CONTEMPORARY CAP
ROOF
CEILING SUPPORT BOX
DVL CLOSE
CLEARANCE PIPE
NEW BUCK
CAST COLLAR
Part# MA6CHIMCNB
BUCK STOVE

Advertisement

Table of Contents
loading

Table of Contents