Installation; Step 1: Preparing The Site - NETGEAR GS700TS 724TS Hardware Installation Manual

Smart switch
Table of Contents

Advertisement

This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch
installation involves the following steps:

Step 1: Preparing the Site

Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Installing an SFP GBIC Module
Step 6: Installing a Device
Step 7: Applying AC Power
Step 8: Managing the Switch through a Web Browser or the PC Utility for Initial Configuration
Step 1: Preparing the Site
Before installing the switch, ensure the operating environment meets the requirements in the
following table.
Table 2-1. Site Requirements
Characteristics Requirements
Mounting
• Desktop installations - Provide a flat table or shelf surface.
• Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment
rack that is grounded and physically secure. The rack-mount kit supplied with the switch
is also required.
Access
Locate the switch in a position that allows access to the front panel RJ-45 ports, the ability
to view the front panel LEDs, and easy safe access access to the power connector.
v1.0, November 2007
Chapter 2

Installation

2-29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs700ts 748tsGs724tsGs748tsGs700ts seriesGs700t series

Table of Contents