Conversion From Parallel To Concentric Vent System; Installing Air Fi Lter - Rinnai E50C Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

Available languages

Available languages

6.7.3.1
808000023
2
3
4
1
6
A
B
C
D
1
OK
boiler conversion from parallel
to concentric
fi gure 14a
6.7.3.2
placing air fi lter on air intake
fi gure 14b
30
Boiler conversion from parallel to concentric
Concentric vent adapter (Part. nr. 808000023) consists of:
1. Cover air intake
2. Gasket 3"
3. Gasket 5"
4. Concentric adapter
5. Plugs for measuring points
5
6. Gasket 3"
A. Push the 2 clips slightly outwards
B. Pull the 3" connection out of the boiler
C. Push out the 5" cover from the vent connection (=air intake)
2
D. Connect the concentric vent adapter.
3
- Check if all rubber seals (2, 3, 5 and 6) are positioned on the concentric vent
4
adapter
5
6
- Push the concentric vent adapter in the boiler, in the boiler exhaust pipe until
'CLICK'
- Press the 3" cover (1) in the connection at the back until 'CLICK'.
.
Installing air fi lter
Push the air fi lter into the air intake on top of the boiler. See fi gure 14b.
The equivalent length of the combustion room air fi lter is 12ft (3.66m).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents