Figure 2 shows typical framing of this fireplace. Figure 3 shows
framing for see-thru installation. All minimum clearances must be
met. Steel framing may be necessary or wood studs may be notched.
Concrete board is provided for facing around the fireplace as shown
in Figure 4.
If you are using a separate combustible mantel piece, refer to Figure 5
for proper installation height. You can install noncombustible mantels
at any height above the fireplace.
Note: Noncombustible mantels may discolor!
17.50"
38"
Figure 2 - Framing Clearances for One Sided Application
15.25"
38"
17.50"
Figure 3 - Framing Clearances for See-Thru Application
127035-01C
INSTALLATION Continued
53.25"
53.25"
53.25"
SuperiorFireplaces.US.com
Figure 4 - Installing Concrete Board
Note: All vertical
measurements are
from top of fireplace
hood opening to
bottom of mantel
shelf.
1
2
Wall
3
A
4
B
C
5
D
E
Noncombustible
material may project
off this surface above
the firebox hood
Supplied firebox
hood must be
used at all times.
4" to Face Opening
Figure 5 - Clearances for Combustible Mantels
Concrete
Board
Mantel
Ref.
Depth Ref.
Opening
1
12"
A
2
9"
B
3
6"
C
4
4"
D
5
2"
E
TOP VIEW
Combustible
Material May
Be Used
SAFE
ZONE
5"
33°
8"
Perpendicular
Wall
Mantel
from
Top of
24"
21"
18"
16"
14"
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vre4543epVre4543

Table of Contents