Bradford White RG1D Installation & Operation Instructions page 33

Table of Contents

Advertisement

Troubleshooting continued-
Control Sequence of Operation
Startup Sequence
Upon powering up, the control checks for the presence of the flammable vapor
sensor, if the resistance is in the expected range the control will begin normal
operation after 5 to 8 seconds.
Normal Heating Sequence
1. The thermostat senses a need for heat.
2. The damper test circuit checks the position of the damper.
3. If the damper is open, and starts the ignition process by providing a spark
at the pilot electrode and allowing gas to flow to the pilot.
4. When the pilot is lit the gas control senses the pilot flame and opens the
main gas valve.
5. The main burner is lit.
6. The main burner (damper in open position) continues to operate until the
thermostat is satisfied.
7. When the thermostat is satisfied the main and pilot gas valves close.
8. The damper remains open for a short period before closing.
The water heater remains in the standby mode until the next call for heat.
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rg2dUrg1d

Table of Contents