Maintenance; Periodic Examination Of Venting Systems And Boiler; Inspection - Rinnai E75CN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

13

Maintenance

i
NOTICE

13.1 Periodic examination of venting systems and boiler

i
NOTICE

13.2 Inspection

Removing casing
64
Maintenance or changes to the boiler may only be carried out by a licensed
professional.
To protect yourself from harm, before performing maintenance:
-
Turn off the electrical power supply by switching off the boiler at the mains power
switch or by turning off the electricity at the circuit breaker.
-
Turn off the gas at the manual gas valve, usually located below the boiler.
-
Turn off the incoming water supply. This can be done at the isolation valve usually
located below the boiler or by turning off the water supply to the building.
The inspection of the boiler and venting system should be done every 2 years or
4000 hours and full maintenance every 4 years or 8000 hours of operation, whichever
occurs fi rst. When doing this the circumstances of the boiler's location must be taken
into account. From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements. Contact details can be found on the back page of this manual.
Preparing the boiler for inspection
To carry out the maintenance activities please follow the next procedure:
-
Switch off the power supply;
-
Shut off the gas;
-
Valve off the boiler from the system using the boiler isolation valves in the plumbing
kit.
-
Remove the 4 screws A,B,C and D in the quick releases of the casing (fi gure 31);
-
Remove the screw E behind the door on the front of the casing (fi gure 31);
-
Remove it towards the front.
-
Clean the casing with a cloth with a simple (non-abrasive) cleaning agent;
fi gure 31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E110cnE75cpE110cp

Table of Contents