North Star M110800F.4 Owner's Manual page 61

24, 30, 37-ton log splitters
Table of Contents

Advertisement

Assembly Instructions
Step 16 – Control Valve
Tools Needed
 Slide control valve handle into the clevis slots on the control valve.
 Pliers
 Align holes in handle with clevis holes.
 Insert the supplied pins through holes and secure with supplied bridge
clips.
Parts Needed from Valve Box:
Control Valve
Control Valve Handle
Bridge Clip
Clevis Slots
Pin
Clevis Slots
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents