NOTE: Nut and bolt are installed (hand tight only) on tow bar mount
for packaging purposes. Remove nut and bolt prior to beginning this
step. They will be re-installed.
Align holes on the tow bar to the tow bar mount on the hydraulic tank
assembly.
Re-install (2) bolts and (2) nuts, and tighten with wrench.
Torque to 71 ft.-lb.
Fasteners Needed (Located on Tank Assembly):
Tow Bar to Tank
Flange Bolt
Tow Bar
.
Assembly Instructions
Step 4 – Tow Bar to Tank
Qty 2
Holes
Tow Bar to Tank
Nyloc Nut
Qty 2
Nut
Tow Bar
Mount
46
Tools Needed
18mm Wrench
(2 Needed)
Torque Wrench
Bolt