Condensate disposal

Condensate drain
1. Th is boiler is a high effi ciency appliance that produces
condensate.
2. Th e side of the boiler has a 1/2 inch (12.7 mm) PVC
union for connection of a 1/2 inch (12.7 mm) PVC pipe
(FIG. 9-1).
3. Slope condensate tubing down and away from the boiler
into a drain or condensate neutralizing fi lter. Condensate
from the Knight XL will be slightly acidic (typically with
a pH from 3 to 5). Install a neutralizing fi lter if required
by local codes.
A Neutralizer Kit (FIG. 9-1) is available from the factory
(100157721 for Models 400 - 501 and 100157700 for
Models 601 - 801).
4. Install the 1/2 inch (12.7 mm) PVC elbow (fi eld supplied)
as shown in FIG. 9-1.
5. Do not expose condensate line to freezing temperatures.
6. Use only plastic tubing or piping as a condensate drain
line (FIG. 9-1).
Figure 9-1 Condensate Disposal
54
1/2" (12.7mm) PVC ELBOW
(FIELD SUPPLIED)
FLOOR DRAIN OR
DRAIN PAN
Installation & Operation Manual
Use materials approved by the authority
NOTICE
having jurisdiction. In the absence of other
authority, PVC and CPVC pipe must comply
with ASTM D1785 or D2845. Cement and
primer must comply with ASME D2564 or
F493. For Canada use CSA or ULC certifi ed
PVC or CPVC pipe, fi ttings, and cement.
To allow for proper drainage on large
NOTICE
horizontal runs, a second line vent may
be required and tubing size may need to
increase to 1 inch (25 mm).
The
condensate
unbstructed, allowing free fl ow of condensate.
If condensate is allowed to freeze in the line
or if the line is obstructed in any other
manner, condensate can exit from the boiler
tee, resulting in potential water damage to
property.
7. A condensate removal pump is required if the boiler is
below the drain. When installing a condensate pump, select
one approved for use with condensing boilers and furnaces.
Th e pump should have an overfl ow switch to prevent
property damage from condensate spillage. Th e switch
should be wired in series with the blocked drain switch
inside the boiler (see FIG. 10-1 on page 57).
IMG00869
1/2" PVC UNION
(FACTORY SUPPLIED)
NEUTRALIZER KIT
100157721 shown for illustration purposes.
line
must
remain

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents