Choice Of Flu - Biasi Advance Plus 16S ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Table of Contents

Advertisement

CORRECT system for installing the wall
flue
A+S
ASA
Fig. 6.5
A = air intake
S = flue exhaust
CORRECT system for installing
S
A
Fig. 6.6
A = air intake
S = flue exhaust
- 40 -
INSTALLATION
S
INCORRECT system for installing
S
A
Fig. 6.7
A = air intake
S = flue exhaust
6.8

Choice of flu

The flue exhaust/air intake can be installing in
the mode:
C
C
C
C
13
33
53
63
Refer to the sheet provided with the pre-se-
lected kit, in separate packaging.
The horizontal routes of the flue pipes must
incline about 1.5 degrees (25 mm per meter).
The terminal must be higher than
the infeed boiler side.
The single coaxial pipe with terminal must be
horizontal because the drain pipe is already
angled.
The following kits to be connected to the boiler
are available:
S

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance plus 30s erpAdvance plus 25s erp

Table of Contents