Hardware Installation; Unpacking - Gigabyte GA-6BA User Manual

Table of Contents

Advertisement

6BA
3.

HARDWARE INSTALLATION

3.1. UNPACKING

The main board package should contain the following:
The 6BA main board.
The Retention Mechanism & Attach Mount
USER'S MANUAL for main board.
Cable set for IDE, Floppy & I/O devices.
CD for main board Utilities.
The main board contains sensitive electric components, which can be easily
damaged by static electricity, so the main board should be left in its original
packing until it is installed.
Unpacking and installation should be done on a grounded anti-static mat. The
operator should be wearing an anti static wristband, grounded at the same
point as the anti-static mat.
Inspect the main board carton for obvious damage. Shipping and handling
may cause damage to your board. Be sure there are no shipping and handling
damages on the board before proceeding.
After opening the main board carton, extract the system board and place it
only on a grounded anti-static surface component side up. Again inspect the
board for damage. Press down on all of the socket IC's to make sure that they
are properly seated. Do this only on with the board placed on a firm flat
surface.
M
DO NOT APPLY POWER TO THE BOARD IF IT HAS BEEN DAMAGED.
3-1

Advertisement

Table of Contents
loading

Table of Contents