1.4.3 Removing the gas valve
Important. ensure gas supply to boiler is turned off.
Removing the gas valve
1. Disconnect the cables from the solenoid and
modureg;
2. Remove the spark generator (see section 1.4.2);
3. Release the nuts "S" using a 30 mm open ended
spanner (see fig. 1.26 - 1.27);
4. Remove the gas valve (see fig. 1.28).
S
S
Fig. 1.26
Fig. 1.27
Fig. 1.28
1.5 Access to the Water Circuit
Important! Before any component is removed, the boil-
er must be drained of all water.
1.5.1 Removing the "main circuit flow switch"
1. Remove the cable of the main circuit flow switch "T"
(do not pull the wires);
2. Remove the screws "U" (see fig. 1.29);
3. Remove the main circuit flow switch.
U
1.5.2 Removing the pump pressure switch
1. Remove the cable of the pump pressure switch "V"
(see fig. 1.30)
2. Unscrew the pump pressure switch by using a
spanner on the nut "X"(see fig. 1.31);
3. Remove the pump pressure switch.
X
T
Fig. 1.29
V
V
Fig. 1.30
Fig. 1.31
11