Horizontal Units - Rheem (-)802PA050314MSA Installation Instructions Manual

Upflow/horizontaltwo stage gas furnaces
Table of Contents

Advertisement

HORIZONTAL UNITS

1. Position the unit to minimize long runs of duct or runs of
duct with many turns and elbows.
2. Unit can be mounted left or right side airflow configuration.
3. Position the unit on adequate supports or by using support
brackets (see Figure 8) and connect supply plenum.
4. If summer air conditioning is desired, position the indoor coil on
the supply air side of the unit. Insure that no air can bypass
this coil.
5. Secure the four angle brackets to the return air opening. See
Figure 9. Connect the return air ducting to the return air open-
ing at the top of the unit. Make the connection air tight to pre-
vent entraining combustion gases from an adjacent
fuel-burning appliance.
NOTE: Do not block furnace access with support rods. Main-
tain clearances recommended in Figure 8. Allow enough
space for proper service maintenance or replacement of the
heat exchanger and blower assembly.
NOTE:
DO NOT BLOCK FURNACE ACCESS WITH
SUPPORT RODS, ALLOW SPACE FOR
PROPER SERVICE MAINTIENCE OR
REPLACEMENT OF THE HEAT EXCHANGER
AND BLOWER ASSEMBLY .
NOTE:
HORIZONTAL LEFT ORIENTATION DEPICTED IN ILLUSTRATION.
HORIZONTAL RIGHT ORIENTATION IS SIMILAR IN INSTALLATION.
ST-A1220-03
FIGURE 9
HORIZONTAL RETURN AIR DUCT
(LEFT-HAND AIRFLOW POSITION SHOWN)
RETURN
FOUR ANGLE BRACKETS CAN BE INSTALLED HORIZONTALLY.
THESE BRACKETS MAY BE USED TO SECURE THE RETURN AIR
DUCT TO A HORIZONTAL UNIT.
DUCTING
AIRFLOW
REAR VIEW
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents