Glass Frame Removal; Final Installation; Brick Installation - MHSC DIRECT VENT MLDV500 Installation And Operating Instructions Manual

Mldv direct vent gas fireplace
Hide thumbs Also See for DIRECT VENT MLDV500:
Table of Contents

Advertisement

GLASS REMOVAL and BRICK INSTALLATION

GLASS FRAME REMOVAL

1. Remove access panel by lifting up and out.
. Release three (3) clamps on bottom of fireplace.
Figure 63
3. Tilt glass frame out and lift glass frame up until it clears
hook on top of fireplace.
4. Set glass frame aside.
Each clamp has a quick spring
f o r c e . W h e n r e i n s t a l l i n g
clamps, keep fingers clear.
WARNING
!

BRICK INSTALLATION

1. Install the rear brick panel by sliding it over the bracket fastened to the rear of the firebox.
. Remove the existing screws fastened to the sides of the firebox toward the tops.
3. Slide the right panel into place and secure the panel using one of the brackets provided with the
kit and one of the screws removed earlier.
4. Repeat step  for the left panel.
75D0004
Glass Frame
Clamps
HOT GLASS WILL
CAUSE BURNS.
DO NOT TOUCH GLASS
UNTIL COOLED.
NEVER ALLOW CHILDREN
TO TOUCH GLASS.
Figure 63 -
Remove Glass Frame
FP1982
glass removal
MLDV Series Gas Fireplace
FP198
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents