Completing The Installation; Installing The Top Cover - IBM eServer 370 xSeries User Reference Manual

Hide thumbs Also See for eServer 370 xSeries:
Table of Contents

Advertisement

Completing the installation

Depending on the options that you have installed, you must reinstall the top cover
and the front bezel to complete the installation. You must also reconnect all the
cables that you disconnected in "Preparing to install options" on page 48, and, after
installing certain options, you must run the Configuration/Setup Utility program.
Follow the instructions in this section.

Installing the top cover

Notes:
1. The top cover is in place during normal operation. If the server is on, do not
2. If necessary, see "Input/output connectors and expansion slots" on page 11 for
To install the server top cover:
1. Before installing the top cover, check that all cables, adapters, and other
2. Place the cover-release latch 1 in the open (up) position.
3. Insert the bottom tabs of the cover 2 in the matching slots in the server
4. Close the cover-release latch to pull the cover forward and lock the cover in
90
xSeries 370 User's Reference
leave the top cover off for more than 30 minutes at a time.
connector locations.
components are installed and seated correctly and that you have not left tools
or loose parts inside the server.
chassis.
place.

Advertisement

Table of Contents
loading

Table of Contents