Mounting bolt 4:
21 N·m (2.1 kgf·m, 15 ft·lb)
4. Install the shift rod bolts 6, shift rod 7
and power trim and tilt relay 8.
5. Connect the pilot water hose 9, trailer
switch coupler 0 (ET), warning indicator
coupler A (EHD), ground lead B (ET),
PTT motor leads C (ET), PTT relay
leads D (ET), 10-pin coupler E, and bat-
tery leads F.
62Y5A11
6. Connect the throttle link rod G and fuel
hose H.
7. Connect the shift cable/shift rod I and
throttle cable J, and then adjust their
lengths. For adjustment procedures, see
Chapter 3, "Checking the throttle cable
operation," and "Checking the gearshift
operation."
Cylinder body
5-50
1
2
3
4
5
6
7
8
9