Ariens 921017 - Deluxe 24 Platinum Owner's/Operator's Manual page 11

921 series sno-thro
Hide thumbs Also See for 921017 - Deluxe 24 Platinum:
Table of Contents

Advertisement

Install Discharge Chute and
Discharge Chute Crank (921013, 022,
023, 027, 031, 034)
(Figure 10 and 11)
1. Grease underside of discharge chute
ring (if not already greased).
2. Remove mounting hardware from auger
housing (Figure 10).
3. Install discharge chute over opening in
the auger housing. Finger tighten the
mounting hardware removed in step 2.
NOTE: Leave discharge chute pedestal loose
to help install the chute crank.
OS7040
4
1. Mounting Holes
2. Discharge Chute
3. Chute Pedestal
4. Discharge Chute Ring
5. Mounting Hardware
Figure 10
4. Insert the short end of the chute crank
into the hole in the front of the control
panel.
NOTE: Be careful not to damage nylon
bushing when attaching crank to the control
panel.
5. Connect the chute crank to the pinion
gear on chute with hairpin.
.
2
1
2
3
6. Orient the chute and pedestal to its most
Install Discharge Chute, Chute
5
Control and Chute Rod
(921017, 018)
(Figure 12 and 13)
OS7045
1. Grease underside of discharge chute
2. Remove mounting hardware from auger
3. Install discharge chute over opening in
NOTE: Leave discharge chute pedestal loose
to help install the chute rod.
EN - 11
921013, 022, 023, 027, 031, 034
1. Chute Crank
2. Control Panel
3. Hairpin
Figure 11
vertical position and tighten pedestal
hardware to 15 – 31 lbf-ft (20 – 42 N•m)
(Figure 10).
ring (if not already greased).
housing.
the auger housing. Finger tighten the
mounting hardware removed in step 2.
3
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents