Miller Electric CV-2 Owner's Manual page 8

Control option
Table of Contents

Advertisement

Transformer T2
Installed Onto
Base Mounting
Strip
B. Transformer And Lower Panel Installation
1.
Locate and install supplied transformer T2 onto
the welding generator as follows:
a. For BIG 30 DIESEL and BIG 30A DIESEL mod-
els: Install T2 onto the right front portion of the
base mounting strip at the prepunched hole lo-
cations (see Figure 3-1). Secure T2 with the
four supplied 1/4-20 x 3/4 in. screws, flat wash-
ers, lockwashers, and nuts on BIG 30 DIESEL,
but do not use flat washers and nuts on BIG 30A
DIESEL.
b. For BIG 40 DIESEL, BIG 40G, and BIG 50 DIE-
SEL models:
Install the supplied mounting
bracket onto T2, and secure bracket with the
four supplied 1/4-20 x 3/4 in. screws, lock wash-
ers, and flat washer. Mount T2 with bracket onto
fuel tank and reactor Z1 support angles (see
Figure 3-5) with T2 located below right front cor-
ner of fuel tank. Secure mounting bracket to
support angles with the three supplied 1/4-20 x
1/2 in. self-tapping screws.
IMPORTANT: To ease CV-2 electrical connections, re-
move weld output terminal mounting bracket from left
front upright Also, before securing CV-2 panel after in-
stallation, check for clearance between lugs of
preinstalled cables on the AC/DC Selector switch termi-
nals and any welding generator components. Reposi-
tion lugs at switch terminals as necessary to prevent
contact between parts.
2.
Install and secure the supplied CV-2 panel onto
the welding generator with the hardware re-
moved in Step 7 of Section A.
OM-880 Page 4
Right Front Cover
Of Unit
BIG 30 DIESEL
And BIG 30A DIESEL
Transformer T2 Installation
Figure 3-1. Location For Transformer T2 Installation
C. Electrical Connections
1.
Disconnect cable 30 from rear of Negative weld
output terminal.
2.
Install a 6 in. (152 mm) long piece of supplied in-
sulated tubing onto cable 30 disconnected in
Step 1.
IMPORTANT: If unit is equipped with dc meters, con-
nect negative (black) voltmeter lead at the connection
point where cables 30 join together. Be sure that the
voltmeter lead is installed last on top of the two cable ter-
minal lugs.
3.
Reconnect cable 30 to switch S1 cable 30 and se-
cure with a supplied 1/4-20 x 1/2 in. flange screw
and nut (see Figure 3-2).
4.
Slide the installed tubing over connections, and
secure with two supplied nylon cable ties (see
Figure 3-2).
5.
Disconnect cable 19 from rear of Positive weld
output terminal.
6.
Install the remaining 6 in. (152 mm) long piece of
insulated tubing onto cable 19 disconnected in
Step 5.
7.
Reconnect cable 19 to switch S1 cable 19, and
secure with a supplied 1/4-20 x 1/2 in. flange
screw and nut (see Figure 3-2).
8.
Slide the installed tubing over connection, and
secure with two supplied nylon cable ties (see
Figure 3-2).
9.
Connect cable 28 from switch S1 to rear of Nega-
tive weld output terminal (see Figure 3-2).
ST-145 421

Advertisement

Table of Contents
loading

Table of Contents