P2 Gear Assembly; P3 Gear Assembly; P2 Base Assembly; P3 Base Assembly - Zenith ABV341 Series Service Manual

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY
P2 Gear Assembly Hole
P3 Gear Assembly Hole
Spring Lever Boss
29. P2 Gear Assembly (Fig. A-8-1)/
P3 Gear Assembly (Fig. A-8-2)/
1) Lift the P2 Gear Assembly up.
2) Lift the P3 Gear Assembly up.
NOTE
When reassembling, align the two Holes of the P2 and P3
Gear Assembly in a straight line after confirming the Sector
Gear Hole (A) and the Slider Plate Hole (B) are aligned as in
the above Fig.
Sector Gear Hole(A)
Slider Plate Hole(B)
(B)
Chassis

P3 Base Assembly

(Fig. A-8-4)

P2 Base Assembly

(Fig. A-8-3)
Fig. A-8
30. P2 Base Assembly (Fig. A-8-3)/
P3 Base Assembly (Fig. A-8-4)
1) Move the P2 Base Assembly in the direction of the arrow
(A) along the slot of the Chassis and disassemble it from
the bottom side.
2) Move the P3 Base Assembly in the direction of the arrow
(B) along the slot of the Chassis and disassemble it from
the bottom side.
Place the Mechanism face up, or return to it's original
position.
4-10

P3 Gear Assembly

(Fig. A-8-2)

P2 Gear Assembly

(Fig. A-8-1)
(A)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xbv343 seriesXbv342 series

Table of Contents