Installing Work Clamp; Installing Gas Supply - Miller Electric OM-1313 Owner's Manual

Arc welding power source and wire feeder
Table of Contents

Advertisement

2-5. Installing Work Clamp

2-6. Installing Gas Supply

Tools Needed:
5/8, 1-1/8 in
1
2
3
4
7
5
6
4
5
Tools Needed:
1/2, 3/4 in
1
2
3
Argon Gas
OR
8
9
CO
Gas
2
1
Work Cable
2
Boot
Slide boot onto work cable. Route
cable out front panel opening from
inside.
3
Negative (–) Output Terminal
Connect cable to terminal and
cover connection with boot.
4
Hardware
5
Work Clamp
Route cable through clamp handle
and secure as shown.
Close door.
ST-801 566-A
Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Regulator/Flowmeter Gas
Hose Connection
6
Welding Power Source Gas
Hose Connection
Connect customer supplied gas
hose between regulator/flowmeter
gas hose connection, and fitting on
1
rear of welding power source.
7
Flow Adjust
Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
2
er's recommended flow rate.
8
CO
Adapter (Customer Sup-
2
plied)
3
9
O-Ring (Customer Supplied)
Install adapter with O-ring between
regulator/flowmeter
and
cylinder.
ST-801 571 / ST-802 028
OM-1313 Page 7
CO
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Millermatic 185M-15

Table of Contents