Download Print this page

Miele DA 210-3 Operating And Installation Instructions page 29

Ventilation system
Hide thumbs Also See for DA 210-3:

Advertisement

^ Screw the mounting plate through the
ceiling and into the structural framing
using 8 x 60 lag bolts and washers.
Once tight, make sure that the
mounting plate can safely support
the weight of the hood.
^ Using at least two people, lift the
hood and guide the spring clips
through their respective slots in the
flange at the top of the chimney.
Make sure they click into place and that
the hood is hanging securely from the
spring clips before allowing them to
carry the weight.
29

Advertisement

loading

This manual is also suitable for:

Da 220-3