Baxi Combi 130 HE Installation & Servicing Instructions Manual page 40

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

Fig. 70
Plate Heat
Plate Heat Exchanger
Exchanger Cover
Fig. 71
Clip
Inline Electrical
Connection
DHW Inlet
Connection
40
Plate Heat Exchanger
Securing Screws
'O' Rings
Flow Switch
Clip
Fig. 72
13.0 Changing Components
13.14
1. Drain the boiler
2. Remove the four screws securing the plate
heat exchanger to the manifolds (Fig. 70).
NOTE: Ensure nuts are not dislodged from the
manifolds.
3. Remove the plate heat exchanger cover
(Fig. 71)
4. Remove the 'O' rings from the manifolds and
replace with new 'O' rings (Fig. 71).
5. Taking care not to displace the 'O' rings fit the
new plate heat exchanger ensuring the nuts are
retained in the manifolds.
6. Refit the plate heat exchanger cover.
13.15
1. Drain the boiler
2. Remove the DHW plate heat exchanger (see
section 13.14).
3. Disconnect the inline electrical connection.
4. Remove the clip at right hand side of the flow
switch.
5. Undo the DHW inlet connection.
6. Remove the flow switch assembly and undo
the second clip.
7. Fit the new flow switch and reassemble in
reverse order.
8. Ensure that both clips are fully inserted from
the front.
9. Fit the DHW plate heat exchanger.
Manifold to Pump
DHW Plate Heat Exchanger
(see Section 13.1 paragraph 2 & 3).
DHW Flow Switch (Fig. 72)
(see Section 13.1 paragraph 2 & 3).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents