7.0 Site Requirements
7.3
1. A flat vertical area is required for the installation of the
boiler.
200mm
2. These dimensions include the necessary clearances
around the boiler for case removal, spanner access and
air movement. Additional clearances may be required
for the passage of pipes around local obstructions such
as joists running parallel to the front face of the boiler.
7.4
850mm
1. The gas installation should be in accordance with the
relevant standards. In GB this is BS 6891. In IE this is
the current edition of I.S. 813 "Domestic Gas
Installations".
2. The connection to the appliance is a 22mm copper
tail located at the rear of the gas service cock.
3. Ensure that the pipework from the meter to the
appliance is of adequate size. Do not use pipes of a
smaller diameter than the boiler gas connection
200mm
(22mm).
7.5
1. External wiring must be correctly earthed, polarised
and in accordance with relevant regulations/rules. In GB
this is the current I.E.E. Wiring Regulations. In IE
reference should be made to the current edition of ETCI
rules.
NOTE: The method of connection to the electricity
supply must facilitate complete electrical isolation of
the appliance. Connection must be via a fused
(1 in 20)
double-pole isolator with a contact separation of at
least 3mm in all poles and servicing the boiler and
system controls only.
Clearances (Fig. 6 & 7)
Gas Supply