Haier AB36NACBEA Service Manual page 26

4hp 5hp universal outdoor unit air conditioning
Hide thumbs Also See for AB36NACBEA:
Table of Contents

Advertisement

(2) Ceiling height
Indoor unit can be installed on ceiling of 2.5-3m in height. (Refer to
Manual of ornament panel.)
(3) Install suspending bolt. Check if the installation place is strong enough to hold weight. Take
necessary measures in case it is not safe. (Distance between holes are marked on paper pattern.
Refer to paper pattern for place need be reinforced)
Air outlet
1500 Over
5.1.3.3 Preparation
(1) Position of ceiling opening between unit and suspending bolt.Unit: mm
890(Ceiling opening)
1070
(Distance between suspending bolts)
515
515
(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)
Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before
installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent
vibration. Contact your real estate dealer
(3) Install a suspending bolt.
(Use a M10 bolt)
To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.
<Installation example>
Installation space
Air outlet
Air inlet
1500 Over
Roof
Anchor bolt
Long nut
Suspending bolt
Note: All the above mentioned parts shall be prepared in field.
Ceiling
- 21 -
INSTALLATION INSTRUCTIONS
8
Foeld setting and Installation
Air inlet
Air outlet
Air inlet
1500 Over
1500 Over
20 Over

Advertisement

Table of Contents
loading

Table of Contents