26 | TCE 4225 | Initial commissioning
Pos.
Name
16
Locking plate
17
Movable lanes
18
Locking jaws
19
Compressed tank
20
Inflation gauge
21
Bead lifting lever
22
Inflation pipe
23
Deflation button
24
Lubricator holder bulb
4.

Initial commissioning

4.1

Unpacking

1. Remove the tape and the fixing clamps from the
pallet and the packaging cardboard.
i
After unpacking check the integrity of TCE 4225 and
check that no components are visibly damaged. In
case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Assembly

4.2.1

Cover removal

1. Unscrew the 4 screws of the side cover and remove
the cover itself.
|
1 695 105 431
2010-02-16
Function
Locking and rotation of the rim.
Positioning of the locking jaws. Tubeless tire inflation.
Internal or external locking of the rim.
Inflates tubeless tires. Inflation is achieved through high pressure blowing that positions
the tire bead on the rim edge.
The air tank (compliant to UE 87/404) has a capacity of 18 litres of compressed air.
Tire inflation check.
The manometer is compliant to CEE 87/217 directive.
Lifting of the tire edge in demounting and mounting phases.
Tire inflation.
Tire defl ation.
Mounting paste container support
4.2.2
1. Get a 1 Mt lifting sling, DR 50 model (safety factor
6:1); wrap the sling around the cantilever arm and
lift the column with a hoist.
2. Lean the column on the casing.

Lifting of the tilting column

Robert Bosch GmbH