Initialization; Maintenance - Panasonic Live Production Suite Series Operating Manual

Gateway/spt/me/system manager unit, menu/control panel optional
Table of Contents

Advertisement

f A log file is saved in an internal storage of the computer.
f Enter the IP address for the <LAN> terminal of the Live Production Suite system in the place of "192.168.0.10". If the address has been changed
from the default setting (192.168.0.90), enter the changed value. For details on IP address setting, refer to "Configuring the network for the Live
Production Suite system".

Initialization

Initializing the setting data
The setting data can be reset to factory settings.
1
Select the <SYS> button → [BOOT] → [Boot] tab.
2
Select [Initial].
f Select the mode to be initialized.
[Initial]
3
Select [OK] in the confirmation screen.
f Initialize the settings data.
@
NOTE
t When settings data is initialized, the still image data and moving image data saved in the video memory is deleted. Data stored in the Storage Module
is not initialized.
t The setting of date and time is not initialized. (page 134)
t Initialization cannot be performed during video (Clip) recording/playback or during event memory playback.
t When you have deleted plug-in software, turn off the power, and restart the unit.
t There may be differences in the items displayed depending on the settings at the time of delivery.
Initializing the fader lever
The transition range of the fader lever can be initialized.
f Initialization should be performed when the fader lever becomes out of adjustment by moving the installation location, etc., and transitions are not
completed even if the fader lever has been pushed as far as it will go.
1
Select the <SYS> button → [BOOT] → [Boot] tab.
2
Select [Panel1]/[Panel2]/[Panel3] in the [Fader Initial] column.
3
Select [OK] in the confirmation screen.
4
Move the fader lever back and forth once.

Maintenance

Confirmation of cumulative operating time
Confirm rough indication of the cumulative operating time of the Live Production Suite system, and the cumulative operating time of the power supply
and cooling fan installed in the Live Production Suite system and the Control Panel.
1
Select the <SYS> button → [MAINTENANCE] → [Mainte] tab
2
Confirm each item in the [System Running] column.
[System]
3
Confirm each item in the [Main Frame Running] column.
[Power 1]
[Power 2]
[Fan]
4
Confirm each item in the [Panel 1 Connecting]/[Panel 2 Connecting]/[Panel 3 Connecting] column.
[Power 1]
[Power 2]
Chapter 8 System Menu — Maintenance settings
Initializes the unit.
f Plug-in software is not deleted.
f Network setting values are not initialized.
Displays the count-up time when the Live Production Suite system is in operation.
Displays the count-up time when the power supply 1 of the Live Production Suite system is in operation.
Displays the count-up time when the power supply 2 of the Live Production Suite system is in operation.
Displays the count-up time when the Live Production Suite system is in operation.
Displays the count-up time when the control panels are connected to the LAN terminal of the Live Production Suite
system and each power supply 1 is in operation.
Displays the count-up time when the control panels are connected to the LAN terminal of the Live Production Suite
system and each power supply 2 is in operation.
– 133 –