Sign In
Upload
Manuals
Brands
Trox Technik Manuals
Fire and Smoke Dampers
FK2-EU
Trox Technik FK2-EU Manuals
Manuals and User Guides for Trox Technik FK2-EU. We have
5
Trox Technik FK2-EU manuals available for free PDF download: Installation And Operating Manual, Manual, Additional Manual, Installation Manual
Trox Technik FK2-EU Installation And Operating Manual (260 pages)
Brand:
Trox Technik
| Category:
Fire and Smoke Dampers
| Size: 14 MB
Table of Contents
Table of Contents
5
Safety
7
General Safety Notes
7
Correct Use
7
Qualified Staff
8
Technical Data
9
General Data
9
FK2-EU with Fusible Link
11
FK2-EU with Spring Return Actuator
14
FK2-EU with Spring Return Actuator and Duct Smoke Detector
14
FK2-EU with Fusible Link and Cover Grille
22
As Air Transfer Unit
22
FK2-EU with Spring Return Actuator and
23
Damper
23
Supply Package, Transport and Storage
25
FK2-EU with Spring Return Actuator
26
FK2-EU with Fusible Link
26
Function in the Ventilation System
26
Parts and Function
26
FK2-EU with Spring Return Actuator and Duct Smoke Detector
27
FK2-EU with Fusible Link and Cover Grille
27
As Air Transfer Unit
27
FK2-EU with Spring Return Actuator and
28
Damper
28
Installation Situations
29
Installation
29
Safety Notes Regarding Installation
33
Installation Kit E3 - Supply Package and Assembly
50
Installation Kit EW - Supply Package and Assembly
53
Installation Kit GM - Supply Package and Assembly
56
Installation Kit WA - Supply Package and Assembly
57
Installation Kit WE - Supply Package and Assembly
61
Installation Kit WE 120 - Assembly (by Others)
64
Installation Kit GL - Supply Package and Assembly
66
General
69
Solid Walls
69
Mortar-Based Installation
70
Mortar-Based Installation - 4 Dampers with a Common Duct
76
Mortar-Based Installation with Partial Mortaring
79
Dry Mortarless Installation into a Solid
80
E1/E2 and Installation Kit E3
80
Mortar-Based Installation with Flexible Ceiling Joint
83
Dry Mortarless Installation on the Face of a Solid Wall, with Installation Kit WA
86
Dry Mortarless Installation Remote from Solid Walls with Installation Kit WE
89
And Mineral Wool
93
Dry Mortarless Installation with Fire Batt
95
Lightweight Partition Walls
97
General
97
Mortar-Based Installation
103
Mortar-Based Installation - 4 Dampers with a Common Duct
111
Dry Mortarless Installation with Installa
114
Tion Kit es
114
Dry Mortarless Installation with Mineral Wool
117
Dry Mortarless Installation with Fire-Rated Gypsum Board or Plasterboard
118
Glk
123
Dry Mortarless Installation Remote from a Lightweight Partition Wall, with Installation Kit WE
130
Dry Mortarless Installation with Fire Batt
132
Section 1
133
Coated Board System
134
Fk2-Eu
134
Lightweight Partition Wall with Metal Support
134
Mineral Wool (Depending on Wall Construction)
134
Structure, Cladding on both Sides
134
Trim Panels, up to W ≤ 100 MM (Optional)
135
Trim Panels, Double Layer
136
General
138
Lightweight Partition Walls with Timber Support Structure or Half-Timbered Con- Structions
138
Mortar-Based Installation
138
Mortar-Based Installation
141
Mortar-Based Installation - 4 Dampers with a Common Duct
153
Dry Mortarless Installation with Installation Kit es
156
Dry Mortarless Installation with Mineral Wool
158
Dry Mortarless Installation with Fire Batt
160
Section 2
161
Coated Board System
162
Fk2-Eu
162
Mineral Wool (Depending on Wall Construction) 7.7 Timber Stud / Nogging, at Least 60 × 80 MM (at Least 60 × 60 MM with F60)
165
Timber Stud Wall
165
Trim Panels, Double Layer with Staggered Joints, Fire-Resistant
166
General
168
Solid Wood Walls
168
Mortar-Based Installation
169
Dry Mortarless Installation with Installation Kit es
170
Dry Mortarless Installation with Mineral Wool
171
Dry Mortarless Installation with Fire Batt
172
General
173
Shaft Walls with Metal Support Structure
173
Mortar-Based Installation
176
Dry Mortarless Installation with Installation Kit es
181
General
183
Shaft Walls Without Metal Support Structure
183
Dry Mortarless Installation with Installation Kit es
185
General
186
Solid Ceiling Slabs
186
Mortar-Based Installation into Solid Ceiling Slabs
188
Mortar-Based Installation - Multiple Installation into One Installation Opening
195
Mortar-Based Installation into a Concrete Base
197
Mortar-Based Installation into a Concrete Base - Multiple Installation Opening into One Installation Opening
201
Mortar-Based Installation into Hollow Concrete Block Ceilings
204
Mortar-Based Installation into Hollow Core Slabs
205
Mortar-Based Installation into Ribbed Ceilings
206
Mortar-Based Installation into Composite Ceilings
207
Mortar-Based Installation in Conjunction with Wooden Beam Ceilings
208
Mortar-Based Installation in Conjunction with Solid Wood Ceilings
209
Mortar-Based Installation in Conjunction with Lightweight Ceilings
210
Dry Mortarless Installation above or below a Solid Ceiling Slab with Installation Kit WA
211
Dry Mortarless Installation Remote from Solid Ceiling Slabs, with Installation Kit WE
212
Dry Mortarless Installation with Fire Batt
216
Mortar-Based Installation into Solid Wood Ceilings
220
Solid Wood Ceilings
220
Dry Mortarless Installation into Solid Wood Ceilings, with Installation Kit es
221
Mortar-Based Installation into Wooden Beam Ceilings
222
Wooden Beam Ceilings
222
Dry Mortarless Installation into Wooden Beam Ceilings, with Installation Kit es
224
Mortar-Based Installation into Historic Wooden Beam Ceilings
226
Fixing the Fire Damper
228
General
228
Suspending Fire Dampers Installed Remote from Solid Walls and Ceiling Slabs
229
Fixing the Damper When a Fire Batt Is Used
230
Accessories
233
Electrical Connection
236
General Safety Notes
236
Limit Switches (Fire Dampers with Fusible Link)
236
Spring Return Actuator
236
Spring Return Actuator and Duct Smoke Detector RM-O-3-D
236
Functional Test
237
Functional Test with Automatic Control Unit
237
General
237
Fire Damper with Fusible Link
238
Fusible Link - Size 1
238
Fusible Link - Sizes 2 and 3
239
Fire Damper with Spring Return Actuator
242
Spring Return Actuator - BFL
242
Commissioning
244
General
245
Maintenance
245
Fusible Link - Size 1
246
Replacing the Fusible Link
246
Fusible Link - Sizes 2 and 3
247
Inspection, Maintenance and Repair Measures
248
Decommissioning, Removal and Disposal
250
Nomenclature
251
Change History
256
Index
257
Advertisement
Trox Technik FK2-EU Installation And Operating Manual (208 pages)
Fire damper
Brand:
Trox Technik
| Category:
Fire and Smoke Dampers
| Size: 11 MB
Table of Contents
Table of Contents
5
1 Safety
7
General Safety Notes
7
Correct Use
7
Qualified Staff
8
2 Technical Data
9
General Data
9
FK2-EU with Fusible Link
11
FK2-EU with Spring Return Actuator
14
FK2-EU with Spring Return Actuator and Duct Smoke Detector
14
FK2-EU with Fusible Link and Cover Grille
22
Used as an Air Transfer Unit
22
FK2-EU with Spring Return Actuator and
23
Transfer Damper
23
3 Supply Package, Transport and Storage
24
4 Parts and Function
25
FK2-EU with Fusible Link
25
FK2-EU with Spring Return Actuator
25
FK2-EU with Spring Return Actuator and Duct Smoke Detector
26
FK2-EU with Fusible Link and Cover Grille
26
Used as an Air Transfer Unit
26
FK2-EU with Spring Return Actuator and
27
Transfer Damper
27
5 Installation
28
Installation Situations
28
Safety Notes Regarding Installation
33
General Installation Information
45
Installation Kit Supply Package and Assembly WA / WE
50
Solid Walls
52
Mortar-Based Installation
53
Mortar-Based Installation - Multiple
57
Occupancy of an Installation Opening
57
Mortar-Based Installation - 4-Way Arrangement with Common Duct
59
Mortar-Based Installation with Flexible Ceiling Joint
63
Dry Mortarless Installation on a Solid Wall with Installation Kit WA
66
Dry Mortarless Installation with Fire Batt
71
Lightweight Partition Walls and Compart- Ment Walls with Metal Support Structure
73
Mortar-Based Installation
77
Fk2-Eu
83
Mortar
83
Lightweight Partition Wall with Metal Support Struc
84
Ture, Cladding on both Sides
84
Mortar-Based Installation - 4-Way Arrangement with Common Duct
85
Solid Ceiling Slab
90
Dry Wall Screw
90
Mineral Wool (Depending on Wall Construction)
90
Lightweight Partition Wall Ä
90
Dry Mortarless Installation with Mineral Wool
91
Dry Mortarless Installation with Plasterboard Cladding/Fire-Rated Plasterboard Panels
92
Dry Mortarless Installation with Flexible Ceiling Joint and Installation Kit GL100
93
Dry Mortarless Installation Remote from a Lightweight Partition Wall with Installation Kit WE
98
Dry Mortarless Installation with Fire Batt
100
Lightweight Partition Walls with Timber Support Structure
104
Mortar-Based Installation
106
Mortar-Based Installation - Multiple
110
Occupancy of an Installation Opening
110
Mortar-Based Installation - 4-Way
113
Dry Mortarless Installation with Installation Kit es
116
Dry Mortarless Installation with Mineral
118
Dry Mortarless Installation with Fire Batt
120
Solid Wood Walls
126
Mortar-Based Installation
127
Dry Mortarless Installation with Mineral Wool
129
Dry Mortarless Installation with Fire Batt
130
Shaft Walls with Metal Support Structure
131
Mortar-Based Installation
133
Shaft Walls Without Metal Support Structure
140
Dry Mortarless Installation with Installation Kit es
142
Solid Ceiling Slabs
143
Ceiling Slabs
144
Crete Base
150
Mortar-Based Installation into Hollow Stone Ceilings
155
Mortar-Based Installation into Hollow Chamber Ceilings
156
Mortar-Based Installation into Ribbed Ceilings
157
Mortar-Based Installation into Composite Ceilings
158
Mortar-Based Installation in Conjunction with Wooden Beam Ceilings
159
Mortar-Based Installation in Conjunction with Solid Wood Ceilings
160
Mortar-Based Installation in Conjunction with Lightweight Ceilings
161
Dry Mortarless Installation on or under a Solid Ceiling Slab with Installation Kit WA
162
Dry Mortarless Installation Remote from Solid Ceiling Slabs with Installation Kit WE
163
Dry Mortarless Installation with Fire Batt
165
Solid Wood Ceilings
169
Mortar-Based Installation into Solid Wood Ceilings
169
Dry Mortarless Installation with Installation Kit es into Solid Wood Ceilings
170
Wooden Beam Ceilings
171
Mortar-Based Installation into Wooden Beam Ceilings
171
Dry Mortarless Installation with Installation Kit es into Wooden Beam Ceilings
173
Mortar-Based Installation into Historical Wooden Beam Ceilings
175
Fixing the Fire Damper
177
General
177
Suspending Fire Dampers Installed Remote from Solid Walls and Ceiling Slabs
178
Fixing the Damper When a Fire Batt Is Used
179
6 Accessories
182
7 Electrical Connection
185
Limit Switches (Fire Dampers with Fusible Link)
185
Spring Return Actuator
185
Spring Return Actuator and Duct Smoke Detector RM-O-3-D
185
8 Functional Test
186
Fire Damper with Fusible Link
186
Fusible Link - Size 1
186
Fusible Link - Size 2 and 3
187
Fire Damper with Spring Return Actuator
190
Spring Return Actuator - BFL
190
Functional Test with Automatic Control Unit
192
9 Commissioning
193
10 Maintenance
194
General
194
Replacing the Fusible Link
195
Fusible Link - Size 1
195
Fusible Link - Size 2 and 3
196
Inspection, Maintenance and Repair Measures
197
11 Decommissioning, Removal and Disposal
199
12 Explanation
200
13 Index
204
Trox Technik FK2-EU Manual (61 pages)
Brand:
Trox Technik
| Category:
Controller
| Size: 3 MB
Table of Contents
Construction Features
3
Other Components
3
Technical Information
4
Accessories and Attachments
29
Advertisement
Trox Technik FK2-EU Additional Manual (16 pages)
Conversion kit
Brand:
Trox Technik
| Category:
Air Handlers
| Size: 2 MB
Trox Technik FK2-EU Installation Manual (12 pages)
Brand:
Trox Technik
| Category:
Fire and Smoke Dampers
| Size: 2 MB
Advertisement
Related Products
Trox Technik FKRS-EU
Trox Technik FK-EU
Trox Technik FKR-EU
Trox Technik FKRS-EU Series
Trox Technik FKRS-EU/DE/150/Z00
Trox Technik FKRS-EU/DE/160/Z00
Trox Technik FKRS-EU/DE/180/Z00
Trox Technik FKRS-EU/DE/200/Z00
Trox Technik FKRS-EU/DE/224/Z00
Trox Technik FKRS-EU/DE/280/Z00
Trox Technik Categories
Fire and Smoke Dampers
Fan
Air Handlers
Control Unit
Controller
More Trox Technik Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL