Sign In
Upload
Manuals
Brands
Slaughter Manuals
Test Equipment
6330
Slaughter 6330 Manuals
Manuals and User Guides for Slaughter 6330. We have
2
Slaughter 6330 manuals available for free PDF download: Operation And Service Manual, Quick Start Manual
Slaughter 6330 Operation And Service Manual (98 pages)
(AC/DC HIPOT WITH IR, GROUND BOND, FUNCTIONAL RUN AND LINE LEAKAGE TESTERS
Brand:
Slaughter
| Category:
Test Equipment
| Size: 1 MB
Table of Contents
Declaration of Conformity
2
Warranty Policy
3
Table of Contents
5
Section 1 Operators Manual
7
Safety
8
Service and Maintenance
9
User Service
9
Service Interval
9
User Modifications
9
Power
10
Work Area
10
Test Operator
11
Qualifications
11
Safety Procedures
11
Dress
11
Key Safety Points to Remember
12
Glossary of Terms
13
Introduction
13
Introduction
14
User Safety
14
The Dielectric Withstand (Hipot) Test
14
Advantages and Disadvantages of AC Testing and DC Testing
15
AC Testing Characteristics
15
AC Testing Advantages
15
AC Testing Disadvantages
16
DC Testing Characteristics
16
DC Testing Advantages
16
DC Testing Disadvantages
16
The Insulation Resistance Test
17
Types of Failures Detectable Only with a Hipot Test
17
Why Perform a Ground Bond Test
17
The Line Leakage Test
17
Why Perform a Functional Run Test
18
Model 6330 Functional Specifications
19
Functional Run Test Mode
21
Settings
21
Measurement
21
Key Features & Benefits of Model 6330
24
Front Panel Controls
27
Reset Button
27
Test Button
27
Lcd Display
27
Up Arrow
28
Exit Key
28
High Voltage Output Terminal
28
High Voltage Arrow
28
Rear Panel Controls
29
Gnd Connection
30
Case Connection
30
Chassis Ground (Earth) Terminal
30
Input Power Receptacle
30
Installation
31
Unpacking and Inspection
31
Safe Lifting and Carrying Instructions
31
Contents of the Carton
32
Preparation for Use
32
Power Requirements and Line Voltage Selection
32
Power Cable
33
Operating Environment
33
Storage and Shipment
33
Quick Start
34
Defaults
34
Dut Output
35
Operation Instructions for Model 6330
37
Power up
37
Setup Procedure
37
Memory Configuration
37
To Select the Memory Location
38
To Select the Step Location
38
AC and DC Dielectric Withstand Test Modes Setting
39
To Set the Output Voltage
39
To Set the High Leakage Current Limit
39
To Set the Low Leakage Current Limit
40
To Set the Ramp Time
40
To Set the Dwell Time
40
To Set the Frequency 50/60 Hz
40
To Set the DUT OUTPUT on
41
To Set the Connect Mode ON/OFF
41
IR Insulation Resistance Test Mode Setting
41
To Set the High Resistance Limit
42
To Set the Low Resistance Limit
42
To Set the Delay Time
42
GND Bond Test Mode Setting
43
To Set the Output Current
43
To Set the High or Low Limits
43
Functional Run Test Mode Setting
45
To Set the HI and lo Limits (Voltage)
45
To Set the HI and lo Limits (Current)
45
To Set the HI and lo Limits (Power)
45
To Set the HI and lo Limits (Power Factor)
46
To Set the HI and lo Limits (Leakage Current)
46
To Set the Line Condition
48
To Set the Measuring Device (MD)
48
Circuit Diagrams
49
System Menu Parameters Setting
51
To Set the PLC Remote ON/OFF
51
To Set the Single Step ON/OFF
51
To Set the Fail Stop ON/OFF
52
Key Lock or Memory Lock Setting
52
Alarm Volume
53
DUT-HV Set Setting
54
Operating Procedures
55
Instrument Connections
55
Display
55
AC or DC Dielectric Withstand Test Mode
55
Insulation Resistance Test Mode
57
Ground Bond Test Mode
58
If the DUT Has
60
Line Leakage Test Mode
62
Fatal Error
65
Connection of Remote I/O
66
Remote Interface Rear Panel
66
Signal Outputs on Remote I/O
66
Signal Inputs of Remote I/O
67
Programmed Tests
67
Remote Interlock
68
Interlock Open
68
Functional Run/Line Leakage Stand-Alone Test Lead Connections
69
Adapter Box Connections
70
Bus Remote Interface: RS-232
72
RS-232 Interface
72
RS-232 Interface Command List
72
Test Execution Commands
73
File Editing Commands and Companion Queries
73
Test Parameter Editing Commands
74
IEEE 488.2 Common Commands
78
Model 6330 Options
81
6330 Options
81
Option 01 Rack Mount Kit
82
Section 2 Service Manual
83
Calibration Procedures
84
Calibration Equipment Required
84
Calibration Initialization
84
To Calibrate AC Voltage
85
To Calibrate DC Voltage
85
To Calibrate IR Voltage
85
To Calibrate AC Current
86
To Calibrate DC Current
86
To Calibrate Insulation Resistance Low Range
87
To Calibrate Insulation Resistance MID Range 1
87
To Calibrate Insulation Resistance High Range
88
To Calibrate Ground Bond Test Voltage
88
To Calibrate Ground Bond Test Current
89
To Calibrate Functional Run Test Voltage
89
To Calibrate the Functional Run Test Current
90
To Calibrate the Functional Run Test Leakage Current
91
To Calibrate the Line Leakage Test Offset
91
To Calibrate the Line Leakage Test X1
92
To Calibrate the Line Leakage Test X4
92
To Calibrate the Line Leakage Test X16
93
To Calibrate the Line Leakage MDA
93
To Calibrate the Line Leakage MDB
93
To Calibrate the Line Leakage MDC
94
To Calibrate the Line Leakage MDX
94
Exit Calibration Mode
95
Replacement Parts List
96
Advertisement
Slaughter 6330 Quick Start Manual (9 pages)
6-in-1 Multi-Function Electrical Safety Tester
Brand:
Slaughter
| Category:
Test Equipment
| Size: 3 MB
Table of Contents
Front Panel Controls
2
Back Panel Controls
3
Setting up the Instrument
4
Selecting a Memory Location
5
Test Connections
7
Test Results
8
Advertisement
Related Products
Slaughter 1305
Slaughter 2205
Slaughter 2503
Slaughter 2510
Slaughter 2550
Slaughter 2925
Slaughter 2935
Slaughter 2945
Slaughter Categories
Test Equipment
More Slaughter Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL