Sign In
Upload
Manuals
Brands
Riello Manuals
Burner
C9336410
Riello C9336410 Burner Control System Manuals
Manuals and User Guides for Riello C9336410 Burner Control System. We have
1
Riello C9336410 Burner Control System manual available for free PDF download: Installation, Use And Maintenance Instructions
Riello C9336410 Installation, Use And Maintenance Instructions (48 pages)
Dual fuel light oil/gas burner
Brand:
Riello
| Category:
Burner
| Size: 2.57 MB
Table of Contents
Table of Contents
3
Information and General Instructions
5
Information about the Instruction Manual
5
Introduction
5
General Dangers
5
Safety Precautions
5
Danger: Live Components
5
Guarantee and Responsibility
6
Owner's Responsibility
6
Safety and Prevention
7
Introduction
7
Personnel Training
7
Technical Description of the Burner
8
Technical Data
8
Burner Models Designation
8
Electrical Data
9
Three Phase Burner
9
Burner Description
10
Packaging - Weight - Approximate Measurements
11
Burner Dimensions
11
Standard Equipment
11
Firing Rate
12
Procedure to Refer Burner Operating Condition in High Altitude Plants
12
Minimum Furnace Dimensions
14
Control Box for the Air/Fuel Ratio (LMV36
15
Actuators (SQM33.5
18
Installation
19
Notes on Safety for the Installation
19
Handling
19
Preliminary Checks
19
Boiler Plate
19
Burner Raising
20
Blast Tube Length
20
Securing the Burner to the Boiler
20
Nozzle
21
Recommended Nozzles
21
Nozzle Assembly
21
Adjusting the Nozzle Flow Rate
22
Electrode Position
23
Burner Refitting
23
Hydraulic System
24
Fuel Supply
24
Hydraulic Connections
25
Pump
25
Pump Priming
25
Gas Line
26
Gas Train
26
Gas Pressure
27
Electrical Wiring
28
Thermal Relay Calibration
29
Electro-Mechanical Thermal Relay
29
Electronic Thermal Relay
29
Motor Connection at 208-230 or 460V
30
Motor Connection at 575V
30
Reversible Direction
30
Start-Up, Calibration and Operation of the Burner
31
Notes on Safety for the First Start-Up
31
Adjustments before First Firing (Light Oil Operation)
31
Combustion Head Setting
31
Pump Adjustment
31
Air Damper Adjustment
31
Ignition Pilot Adjustment
31
Adjustments before First Firing (Gas Operation)
32
Burner Start-Up
33
Adjusting Gas/Air Delivery
33
Adjusting Oil/Air Delivery
33
Final Calibration of the Pressure Switches
34
Air Pressure Switch
34
Maximum Gas Pressure Switch
34
Minimum Gas Pressure Switch
35
Low Oil Pressure Switch
35
High Oil Pressure Switch
35
Burner Starting
36
Steady State Operation
36
Firing Failure
36
Flame Signal Measurement
37
Final Checks (with the Burner Working)
37
Maintenance
38
Notes on Safety for the Maintenance
38
Opening the Burner
39
To Open the Burner
39
To Close the Burner
39
A Appendix - Spare Parts
40
B Appendix - Accessories
43
Appendix - Burner Start up Report
44
Advertisement
Advertisement
Related Products
Riello C9336500
Riello C9336510
Riello C9336401
Riello C9336400
Riello C9334510
Riello C9335502
Riello C9335500
Riello C9337400
Riello C9337410
Riello C9333410
Riello Categories
Burner
Boiler
Indoor Fireplace
UPS
Water Heater
More Riello Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL