Sign In
Upload
Manuals
Brands
Riello Manuals
Burner
C9337410
Riello C9337410 Manuals
Manuals and User Guides for Riello C9337410. We have
1
Riello C9337410 manual available for free PDF download: Installation, Use And Maintenance Instructions
Riello C9337410 Installation, Use And Maintenance Instructions (48 pages)
Dual fuel light oil/gas burners
Brand:
Riello
| Category:
Burner
| Size: 6.75 MB
Table of Contents
Table of Contents
3
Information and General Instructions
5
Information about the Instruction Manual
5
Introduction
5
General Dangers
5
Other Symbols
5
Delivery of the System and the Instruction Manual
6
Guarantee and Responsibility
6
Safety and Prevention
7
Introduction
7
Personnel Training
7
Technical Description of the Burner
8
Technical Data
8
Electrical Data
8
Burner Models Designation
9
Packaging - Weight - Approximate Measurements
9
Burner Dimensions
9
Firing Rate
10
Procedure to Refer Burner Operating Condition at an Altitude And/Or at a Combustion Supporter Air Temperature Different to the Standard Values (328 Ft above Sea Level, 68
11
Minimum Furnace Dimensions
12
Commercial Boilers
12
Standard Equipment
12
Burner Description
13
Control Box for the Air/Fuel Ratio (LMV36
14
Actuators (SQM33.5
17
Installation
18
Notes on Safety for the Installation
18
Handling
18
Preliminary Checks
18
Burner Raising
19
Preparing the Boiler
19
Boring the Boiler Plate
19
Blast Tube Length
19
Securing the Burner to the Boiler
20
Nozzle Installation
21
Nozzle Assembly
21
Adjusting the Nozzle Flow Rate
22
Ignition Pilot Adjustment
23
Combustion Head Setting
23
Burner Refitting
24
Light Oil Supply
25
Fuel Supply
25
Hydraulic Connections
26
Pump
26
Pump Priming
26
Gas Feeding
27
Gas Train
27
Gas Pressure
28
Electrical Wiring
29
Supply Cables and External Connections Passage
30
Thermal Relay Calibration
31
Electro-Mechanical Thermal Relay
31
Electronic Thermal Relay
31
Motor Connection at 208-230 or 460V
32
Motor Connection at 575V
32
Reversible Direction
32
Start-Up, Calibration and Operation of the Burner
33
Notes on Safety for the First Start-Up
33
Adjustments before First Firing (Light Oil Operation)
33
Combustion Head Setting
33
Pump Adjustment
33
Air Damper Adjustment
33
Electrode Position
33
Burner Firing
33
Burner Calibration
33
Adjustments before First Firing (Gas Operation)
34
Burner Start-Up
34
Adjusting Gas/Air Delivery
34
Adjusting Oil/Air Delivery
34
Final Calibration of the Pressure Switches
35
Air Pressure Switch
35
Maximum Gas Pressure Switch
35
Minimum Gas Pressure Switch
36
Low Oil Pressure Switch
36
High Oil Pressure Switch
36
Burner Starting
37
Steady State Operation
37
Firing Failure
37
Flame Signal Measurement
37
Final Checks (with the Burner Working)
38
Maintenance
39
Notes on Safety for the Maintenance
39
Maintenance Programme
39
Maintenance Frequency
39
Safety Test - with Gas Ball Valve Closed
39
Checking and Cleaning
39
Safety Components
40
Opening the Burner
41
Closing the Burner
41
A Appendix - Spare Parts
42
B Appendix - Accessories
46
Appendix - Burner Start up Report
47
Advertisement
Advertisement
Related Products
Riello C9337401
Riello C9337400
Riello C9334503
Riello C9335500
Riello C9335510
Riello C9336500
Riello C9336510
Riello C9335400
Riello C9335401
Riello C9333453
Riello Categories
Burner
Boiler
Indoor Fireplace
UPS
Water Heater
More Riello Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL