Sign In
Upload
Manuals
Brands
OutBack Power Manuals
Power Supply
SmartRE 2500
OutBack Power SmartRE 2500 Manuals
Manuals and User Guides for OutBack Power SmartRE 2500. We have
1
OutBack Power SmartRE 2500 manual available for free PDF download: Installation Manual
OutBack Power SmartRE 2500 Installation Manual (70 pages)
Brand:
OutBack Power
| Category:
Power Supply
| Size: 2.45 MB
Table of Contents
Contact Information
2
Warranty Summary
2
Important Safety Instructions
3
Symbols Used
3
Audience
3
Definitions
4
General Safety
4
Personal Safety
5
Smartre System Safety
5
PV Safety
6
Battery Safety
6
Regulatory References
7
Recycling Information
7
Earth 911
8
Ourearth.org
8
Environmental Protection Agency, USA
8
Keep America Beautiful, USA
8
Natural Resources Canada
8
Office of Waste Management, Canada
8
Table of Contents
9
Introduction
13
Figure 1 Smartre 3000 with Top Caps and Front Covers
13
Components
14
Accessories
14
Basic Components of a Smartre System
14
Figure 2 Basic Components of a Smartre System
14
Applications
15
PV Array Planning
15
Figure 3 Typical Grid-Interactive Application
15
Battery Bank Planning
16
Generators
16
Recommended Batteries for Use with the Smartre
16
Bank Sizing
16
Types of Batteries
16
Preparation
17
Tools Required
17
Materials Required
17
Accessories
17
Location
17
Figure 4 Flexibility of Installation
17
Environmental
18
Clearance and Access Requirements
18
Figure 5 Clearance and Access Requirements
18
Dimensions
19
Figure 6 Enclosure Dimensions
19
Conduit and Knockout Preparation
20
Figure 7 Conduit and Knockout Preparation
20
Horizontal Arrangements
21
Vertical Arrangements
21
Figure 8 Horizontal Versus Vertical Arrangements
22
Figure 9 Mounting Options (Wall Brackets or Anchor Bolts)
23
Figure 10 Mounting to the Wall at Floor Level
24
Installing the Wall Brackets for a Horizontal Position
24
Figure 11 Mounting to the Wall above Floor Level
25
Installing the Bottom Bracket for an Elevated Position
25
Figure 12 Installing Wall Brackets for Vertical Position
26
Installing Wall Brackets for Vertical Position
26
Figure 13 Interlocking Enclosures Onto Wall Brackets
27
Figure 14 Correct Placement for Vertical Installations
28
Mounting
23
Figure 15 Removing the Interior Cover
29
Removing the Interior Cover
29
Accessing the Wiring Compartment
30
Figure 16 Wiring and Breaker Compartment
30
Wiring
31
Grounding and Neutral Connections
31
Table 4
31
Table 4 Ground Conductor Size and Torque Requirements
31
Figure 17 Ground Connections
31
DC Connections
32
DC Conductor Size and Torque Requirements
32
Figure 18 DC Connections
32
AC Connections
33
AC Conductor Size and Torque Requirements
33
Figure 19 AC Connections
33
Figure 20 MATE2 Features
34
Figure 21 MATE2 Dimensions (Not to Scale)
34
MATE2 Installation
34
Figure 22 Permanently Connecting the MATE2 to the Smartre
35
Figure 23 Temporarily Connecting the MATE2 to the Smartre
36
Functional Test/Commissioning
37
Pre-Startup Procedures
37
Energize/Startup
37
Figure 24 Functional Test Procedures
37
Setting Time, Date & Display
38
Figure 25 MATE Setup Screen
38
Figure 26 MATE Setup Screen (Page 2 and 3)
39
Setting System Parameters - the Advanced Menu
40
Figure 27 Accessing the Advanced Menus
40
Setting Battery Amp-Hours and Return Amps
41
Figure 28 Configuring System Parameters
41
De-Energize/Shutdown
42
Figure 29 Shutdown Procedures
42
Reassembling the Enclosures
43
Electronics Enclosure Interior Cover
43
Adding the Front Cover Brackets to Electronics Enclosure
43
Figure 30 Reassembling the Electronics Enclosure
43
Figure 31 Adding the Front Cover Bracket to the Electronics Enclosure
43
Battery Enclosure Interior Cover
44
Adding the Front Cover Brackets to Battery Enclosure
44
For Outdoor Installations (3R-Rating)
45
Installing the Top Cap
45
Installing the Locking Bracket
45
Installing the Front Cover
46
Specifications
47
Electrical Specifications
47
Mechanical Specifications
48
Environmental Specifications
48
Renewable Energy Input & Storage
49
PV Sizing
49
Battery Bank Sizing
49
Amp-Hour Requirements
49
Discharge Rate
50
Estimating Amp Hours
50
Table 7 Worksheet for Determining Average Daily Load in Amp-Hours
52
Table 8 Worksheet for Determining Battery Bank Size
53
Wiring Configurations
55
120 Vac Vertical Installation with an External Sub-Panel
57
120 Vac Vertical Installation Using Internal Sub-Panel
58
120 Vac Horizontal Installation with an External Sub-Panel
59
120 Vac Horizontal Installation Using the Internal Sub-Panel
60
120/240 Vac Horizontal Installation
61
Wiring Schematic for 2500 W and 3000 W, 120 Vac Configurations
62
Wiring Schematic for 2500 W and 3000 W, 120/240 Vac Configurations
63
Warranty
65
How to Arrange for Warranty Service
66
Return Material Authorization (RMA)
66
Returning Product to Outback
66
Index
67
Advertisement
Advertisement
Related Products
OutBack Power SmartRE 3000
OutBack Power SmartRE 5000
OutBack Power SmartRE 6000
OutBack Power EnergyCell 2000RE
OutBack Power EnergyCell 2200RE
OutBack Power EnergyCell 2700RE
Outback Power VFXR302E
OutBack Power Categories
Inverter
Controller
Battery Charger
Power Supply
Measuring Instruments
More OutBack Power Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL