Sign In
Upload
Manuals
Brands
MR Manuals
Industrial Electrical
TRAFOGUARD ISM
User Manuals: MR TRAFOGUARD ISM Monitoring System
Manuals and User Guides for MR TRAFOGUARD ISM Monitoring System. We have
1
MR TRAFOGUARD ISM Monitoring System manual available for free PDF download: Operating Instructions Manual
MR TRAFOGUARD ISM Operating Instructions Manual (224 pages)
Monitoring System
Brand:
MR
| Category:
Industrial Electrical
| Size: 12 MB
Table of Contents
Table of Contents
3
1 Introduction
9
Manufacturer
9
Completeness
9
Safekeeping
9
Notation Conventions
9
Hazard Communication System
9
Information System
11
Instruction System
11
Typographic Conventions
12
2 Safety
13
Appropriate Use
13
Fundamental Safety Instructions
13
Personnel Qualification
15
Personal Protective Equipment
16
3 Product Description
18
Scope of Delivery
18
Function Description
18
Performance Features
19
Design
20
Power Supply
21
Power Supply
22
Central Processing Unit
22
Voltage Measurement and Current Measurement
23
Digital Inputs and Outputs
23
Analog Inputs and Outputs
24
Media Converter
25
Media Converter with Managed Switch
26
Operating Concept
26
4 Mounting
30
Preparation
30
Electromagnetic Compatibility
30
Wiring Requirement of Installation Site
31
Wiring Requirement of Operating Site
31
Wiring Requirement in Control Cabinet
32
Information about Shielding the CAN Bus
33
Minimum Distances
34
Installing the 19-Inch Plug-In Housing
34
Installing the Individual Components on a Cap Rail
37
Fastening the Cap Rail
37
Installing the Bus Rail on the Cap Rail
39
Installing the Assembly at a Distance on the Cap Rail
39
Connecting Device
40
Cable Recommendation
41
Information about Connecting Serial Interfaces RS232 and RS485
42
Information about Laying Fiber-Optic Cable
45
Mounting Terminating Resistor of CAN Bus
45
Connecting Cables to the System Periphery
45
Wiring the CPU I Assembly
46
Wiring the UI Assembly
49
Wiring the AIO Assembly
51
Wiring the DIO Assembly
56
Wiring the MC 2-2/SW3-3 Assembly
58
Wiring the G1 (PULS) Assembly
60
Connecting the Power Supply
62
5 Commissioning
64
Performing Tests
64
Ground Test
64
Performing a High Voltage Test
66
Setting the Language
68
Setting Date and Time
69
Commissioning Wizard
70
Checking Measured Values and Status of Digital Inputs and Outputs
71
6 Functions and Settings
72
General
72
Activating/Deactivating Automatic Launch of Commissioning Wizard
73
Setting Measured Value Display
73
Transformer Name
73
Visualization
73
Control (Optional)
77
Setting the Desired Value
77
Bandwidth
90
Delay Time T1
91
Delay Time T2
93
Transformer Data
96
Setting the Primary Transformer Voltage
96
Setting the Secondary Transformer Voltage
96
Setting Primary Transformer Current
96
Setting the Secondary Transformer Current
97
Setting Circuit for Current Transformer/Voltage Transformer and Phase Angle Correction
97
Measurement
104
Setting UI Measuring Channels
104
Control Variable
105
Regulation Mode
105
Control of the Motor-Drive Unit (Optional)
105
Setting the Switching Pulse for Controlling the Motor-Drive Unit
106
Setting Motor Runtime Monitoring
107
Setting the Switching Direction
107
Parallel Operation (Optional)
108
Activating Parallel Operation
109
Selecting Parallel Operation Method
109
Assigning a CAN Bus Address
112
Setting Behavior if no Communication Present
113
Setting Delay Time for Parallel Operation Error Messages
113
TAPCON® 2Xx Retrofit
113
Limit Values
114
Voltage Monitoring
117
Current Monitoring
118
Power Monitoring
119
Bandwidth Monitoring
119
Temperature Monitoring
121
Tx Statistics Monitoring
122
DGA Monitoring
123
Tap Position Monitoring
124
Hot-Spot Calculation (Optional)
124
Setting Calculation of Transformer's Loss of Life (Optional)
125
Cooling System Control (Optional)
126
Configuring Cooling Stages
127
Configuring Load-Dependent Mode
130
Configuring Periodic Mode
131
Configuring Alternating Mode
132
Displaying Status of Cooling Stages
133
Displaying Protective Device Status (Optional)
134
Displaying Tap-Change Operation Statistics (Optional)
135
DGA Measured Value Trend
136
Displaying Temperature Curve (Optional)
137
Changing Tap Position Designation (Optional)
138
Displaying Information about Contact Wear (Only OILTAP®)
139
Configuring Analog Inputs and Outputs (Optional)
139
Name Plate (Optional)
141
Enter the Name Plate Data
142
Displaying the Name Plate
142
Maintenance (Optional)
143
Setting Operator Interval for OLTC Maintenance
144
Setting Operator Interval for Transformer Maintenance
145
Undertaking and Confirming Maintenance
146
Displaying Maintenance Overview
147
Event Management
148
Displaying and Acknowledging Events
148
Configuring Events
148
Displaying Event Memory
150
Measured Values
151
Displaying Current Measured Values
152
Displaying Measured Value Recorder (Optional)
152
Scada
156
Configuring IEC 61850 (Optional)
156
Configuring IEC 60870-5-101 (Optional)
159
Configuring IEC 60870-5-103 (Optional)
162
Configuring IEC 60870-5-104 (Optional)
164
Configuring Modbus (Optional)
166
Configuring DNP3 (Optional)
169
Time Synchronization
173
Activating Time Synchronization Using SNTP
173
Entering the Time Server Address
174
Setting the Time Zone
175
Setting Synchronization Interval
175
Reference Time
175
User Administration
176
User Roles
176
Changing Password
177
Creating, Editing and Deleting Users
178
Setting Access Rights to Parameters and Events
180
Information about Device
181
Hardware
181
Software
182
Parallel Operation
182
Import/Export Manager
183
Exporting Data
183
Importing Data
184
Linking Signals and Events
185
Linking Functions
186
Linking Digital Outputs and Control System Messages
187
7 Fault Elimination
190
General Faults
190
Human-Machine Interface
190
Other Faults
190
8 Uninstallation
192
Uninstalling the CPU I Assembly
193
Uninstalling the UI 1/UI 3 Assembly
196
Uninstalling the AIO 2/AIO 4 Assembly
197
Uninstalling the DIO 28-15/DIO 42-20 Assembly
199
Uninstalling the MC 2-2/SW 3-3 Assembly
201
Uninstalling the QS3.241 Assembly
203
Uninstalling the Bus Rail
204
9 Disposal
205
10 Technical Data
206
Voltage Supply (G1 PULS QS3.241)
206
Voltage Supply
206
Voltage Measurement and Current Measurement
207
Digital Inputs and Outputs
208
Analog Inputs and Outputs
210
Central Processing Unit
211
System Networking
213
Ambient Conditions
214
Standards and Directives
215
11 Appendix
217
Check List for Commissioning
217
Glossary
218
List of Key Words
219
Advertisement
Advertisement
Related Products
MR TAPGUARD 260
MR TAPCON
MR TAPMOTION ED Series
MR TAPMOTION TD ISM
MR TAPCON LV
MR TAPCON 230 Expert
MR MESSKO MT-ST TRASY2
MR TAPMOTION MD-III
MR VACUTAP VM-Ex
MR Categories
Industrial Equipment
Controller
Measuring Instruments
Thermometer
Control Systems
More MR Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL