Sign In
Upload
Manuals
Brands
Grove Manuals
Construction Equipment
RT 9000E Series
Grove RT 9000E Series Manuals
Manuals and User Guides for Grove RT 9000E Series. We have
1
Grove RT 9000E Series manual available for free PDF download: Operator’s And Safety Handbook
Grove RT 9000E Series Operator’s And Safety Handbook (102 pages)
Brand:
Grove
| Category:
Construction Equipment
| Size: 2 MB
Table of Contents
Table of Contents
7
Section 1 - INTRODUCTION
13
General
13
Noise Vibration Test Results
13
Basic Nomenclature
14
Section 2: SAFETY PRECAUTIONS
17
General
17
Operator's Information
17
Operator's Qualifications
18
Crane Stability/Structural Strength
18
Load Charts
19
Work Site
20
Lifting Operations
20
Wind Velocity Chart
21
Counterweight
22
Multiple Crane Lifts
22
Load Moment Indicating (Lmi) Systems
22
Two-Blocking
22
Work Area Definition System
23
Electrocution Hazard
23
Set up and Operation
24
Electrocution Hazard Devices
24
Electrical Contact
25
Special Operating Conditions and Equipment
25
Crushing Hazards
26
Personnel Handling
27
Travel Operation
28
Maintenance
28
Service and Repairs
28
Lubrication
29
Tires
29
Wire Rope
29
Batteries
30
Engine
31
Work Practices
31
Crane Access
31
Job Preparation
31
Working
32
Lifting
33
Hand Signals
34
Transporting the Crane
34
Shutdown
35
Boom Extension/Jib
35
Cold Weather Operation
35
Temperature Effects on Hydraulic Cylinders
36
Boom Drift Chart
36
Section 3 - CAB CONTROLS and INDICATORS
37
Defroster Switch
37
Hand Throttle Lock Control
37
Ignition Switch
37
Voltmeter
37
Transmission Oil Temperature Gauge
37
Heat Control Knob
37
Cab Controls and Indicators
37
Crane Travel Operation
52
Traveling - General
52
Traveling with Boom Extension And/Or Insert Erected
52
Extended Travel
53
Moving the Crane
53
Steering
53
Front Wheel Steering
53
Rear Wheel Steering
54
Four Wheel Steering
54
Crabbing
54
Traveling - Forward
54
Traveling - Reverse
54
Four-Wheel Drive Operation
55
Proper Operation of Differential Lock
55
General
55
Operation
55
Proper Operation of Axle Oscillation Lockouts
56
General Crane Operation
56
Pump Drive
56
Setting the Park Brake When Crane Is on Outriggers
56
Control Lever Operation
56
Preload Check
57
Using Your Load Chart
57
Terms to Know
57
Crane Functions
58
Setting the Outriggers
58
Engaging the MID-Extend Lock Pin
59
Stowing the Outriggers
59
Stowing the MID-Extend Lock Pin
59
Swinging the Boom
60
Elevating and Lowering the Boom
60
Elevating the Boom
60
Lowering the Boom
60
Telescoping the Boom
61
Extending the Boom
61
Retracting the Boom
61
Lowering and Raising the Hoist Cable
61
Lowering the Cable
61
Raising the Cable
61
Hoist Speed Range Selection
61
Raising and Lowering the Hydraulic Boom Extension
61
Raising the Hydraulic Boom Extension
62
Lowering the Hydraulic Boom Extension
62
Operational Aids
62
Load Moment Indicator (LMI) System
62
Control Lever Lockout System
63
Stowing and Parking
63
Section 5 - LUBRICATION
65
General
65
Artic Conditions - below - 18°C (0°F)
65
Lubrication Points
65
Lubrication Chart
66
Lube Symbol Chart
66
Wire Rope Lubrication
73
Section 6 - SET-UP and INSTALLATION PROCEDURES
75
General
75
Installing Cable on the Hoist
75
Cable Reeving
75
Installing the Cable Anchor Wedge
75
Reeving Diagram
76
Standard Counterweight and Auxiliary Hoist Mounting Structure
79
Removal
79
Installation
79
Counterweight Removal and Installation
80
Heavy Counterweight Assembly and Auxiliary Hoist Mounting Structure
82
Removal
82
Installation
83
Outrigger Removal and Installation
84
Bleed Valve Operation
84
Procedure
84
Removal
85
Installation
85
Remote Mounted Pin Control Box
85
Erecting and Stowing the Swingaway Boom Extension
86
Erecting
86
Removing and Installing the Swingaway Boom Extension
87
Stowing
90
Connecting and Disconnecting the Hydraulic Boom Extension
91
Connecting
91
Boom Luffing Extension
91
Disconnecting
92
Swingaway Mounting Adjustment
92
Boom Extension (with Inserts)
93
Identification
93
Slinging Points
93
Assembly of Boom Extensions
94
Checklists for Rigging Work
95
Installing the 26 M/34 M Boom Extension
95
Removing the 26 M/34 M Boom Extension
96
Descripiton of Rigging Work
97
Installing/Disassembling 8 M Sections
97
Installing 8 M Sections
98
Removing 8 M Sections
98
Installing/Removing Two-Stage Swingaway Lattice Extension for Boom Extension
98
Installation
98
Removing
99
Luffing Boom Extension)
99
Connections on the 8 M Sections
99
Electrical Connection on the Boom Extension
100
Connections on the 8 M Sections
100
Establishing Electrical Connections
100
Folding Out/In the Deflection Sheaves on the 8 M Sections
100
Positioning/Removing the Hoist Cable
101
Advertisement
Advertisement
Related Products
Grove RT9130E
Grove RT600E
Grove RT540E
Grove GMK 3050-1
Grove GMK 3055
Grove GMK 4080-1
Grove GMK 4100
Grove GMK 4100-L
Grove GMK 5100
Grove GMK 5130-1
Grove Categories
Construction Equipment
Measuring Instruments
Receiver
Control Unit
Engine
More Grove Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL