Fröling Turbomat TM 450 Manuals
Manuals and User Guides for Fröling Turbomat TM 450. We have
2
Fröling Turbomat TM 450 manuals available for free PDF download: Installation Instructions Manual
Fröling Turbomat TM 450 Installation Instructions Manual (108 pages)
Brand:
Fröling
| Category:
Boiler
| Size: 25 MB
Table of Contents
Table of Contents
2
General
4
Safety
5
Hazard Levels of Warnings
5
Qualification of Assembly Staff
6
Personal Protective Equipment for Assembly Staff
6
Design Information
7
Overview of Standards
7
General Standards for Heating Systems
7
Standards for Structural and Safety Devices
7
Standards for Heating Water
7
Regulations and Standards for Permitted Fuels
8
Installation and Approval
8
Installation Site
8
Chimney Connection/Chimney System
9
Connection Line to the Chimney
10
Measuring Port
11
Draught Limiter
11
Combustion Air
12
General Requirement
12
Room Air-Independent Operation
12
Domestic Hot Water
14
Pressure Maintenance Systems
16
Return Lift
16
Technology
17
Dimensions
17
Components and Connections
18
Technical Data
19
Boiler Data for Planning the Flue Gas System
24
Assembly
26
Transport
26
Temporary Storage
26
Positioning
26
Installing the Heat Exchanger
27
Fitting the Underfloor Ash Removal System (Optional)
27
Setting up in the Boiler Room
28
Moving the Boiler in the Boiler Room
28
Operating and Maintenance Areas of the Equipment
28
Installing the Boiler
29
General Information
29
Installing the Grate Drive
30
Assembling the Stoker Unit
31
Installing the Hydraulic Stoker Unit (Optional)
32
Fitting the Burn Back Slide Valve
32
Bolting Together the Combustion Chamber and Heat Exchanger
33
Assembling the Case Cooling Duct (Optional)
35
Change over the WOS Rods to Suit the Heat Exchanger on the Left (Turbomat TM 320)
37
Fitting Various Attachment Parts
38
Removing the Different Blanking Plugs
39
Assembling the Insulation Floor Base Frame
40
Assembling the Flange for the Heat Exchanger Ash Removal System
43
Fitting Thermal Insulation to the Boiler
43
Assembling the FGR Duct
46
Assembling the Upper Insulation Base Frame
47
Installing the Insulating Side Panels
50
Installing the Underpressure Controller
61
Mount the FGR Underpressure Controller (at the FGR Branch before the Induced Draught Fan)
62
Installing the Combustion Chamber Overpressure Monitor and Temperature Sensor
62
Installing the Air Flap Actuators
63
Assembling Different Cover Plates
65
Installing the Heat Exchanger Ash Removal Unit
66
Fitting the Combustion Chamber Ash Removal Unit (Optional)
70
Fitting the WOS Drive
73
Fitting the FGR Blower Fan
83
Fitting the Intermediate Piece (When Using an Electrostatic Precipitator)
86
Installing the Induced Draught Fan
86
Installing the Combustion Air Fan
89
Fitting the Temperature Sensor under the Moving Grate
89
Assembling the Automatic Ignition
90
Assembling the Insulated Doors and Covers
91
Connect the Electrostatic Precipitator (Optional)
94
Hydraulic Connection
95
Connections for the Safety Devices
95
Connecting up the Slide-On Duct Cooling
97
Power Connection and Wiring
98
Potential Equalisation
98
Laying of Cables
98
Final Installation Steps
100
Setting and Checking the Seal on the Doors
100
Adjusting the Doors
101
Commissioning
102
Before Commissioning / Configuring the Boiler
102
Initial Startup
103
Permitted Fuels
103
Wood Shavings
104
Changing the Fuel
104
Non-Permitted Fuels
105
Heating up for the First Time
105
Screed Drying
106
Decommissioning
107
Out of Service for Long Periods
107
Disassembly
107
Disposal
107
Manufacturer's Address
108
Installer's Address
108
Advertisement
Fröling Turbomat TM 450 Installation Instructions Manual (100 pages)
Brand:
Fröling
| Category:
Industrial Equipment
| Size: 24 MB
Table of Contents
Table of Contents
2
1 General
4
2 Safety
5
Hazard Levels of Warnings
5
Qualification of Assembly Staff
6
Personal Protective Equipment for Assembly Staff
6
3 Design Information
7
Overview of Standards
7
General Standards for Heating Systems
7
Standards for Structural and Safety Devices
7
Standards for Heating Water
7
Regulations and Standards for Permitted Fuels
8
Installation and Approval
8
Installation Site
8
Chimney Connection/Chimney System
9
Connection Line to the Chimney
10
Measuring Port
11
Draught Limiter
11
Domestic Hot Water
12
Pressure Maintenance Systems
13
Storage Tank
14
Return Lift
14
4 Technology
15
Dimensions
15
Components and Connections
16
Technical Data
17
Tm 320-450
17
Tm 500-550
19
Boiler Data for Planning the Flue Gas System
21
5 Assembly
22
Transport
22
Temporary Storage
22
Positioning
22
Installing the Heat Exchanger
23
Fitting the Underfloor Ash Removal System (Optional)
23
Setting up in the Boiler Room
24
Moving the Boiler in the Boiler Room
24
Operating and Maintenance Areas of the Equipment
24
Installing the Boiler
25
General Information
25
Installing the Grate Drive
26
Assembling the Stoker Unit
27
Installing the Hydraulic Stoker Unit (Optional)
28
Fitting the Burn Back Slide Valve
28
Bolting Together the Combustion Chamber and Heat Exchanger
29
Assembling the Case Cooling Duct (Optional)
31
Change over the WOS Rods to Suit the Heat Exchanger on the Left (Turbomat TM 320)
33
Fitting Various Attachment Parts
34
Removing the Different Blanking Plugs
35
Assembling the Insulation Floor Base Frame
36
Assembling the Flange for the Heat Exchanger Ash Removal System
39
Fitting Thermal Insulation to the Boiler
39
Assembling the FGR Duct
42
Assembling the Upper Insulation Base Frame
43
Installing the Insulating Side Panels
46
Installing the Underpressure Controller
58
Assembling FGR Differential Pressure Control (for Electrostatic Precipitator)
59
Installing the Combustion Chamber Overpressure Monitor and Temperature Sensor
59
Installing the Air Flap Actuators
60
Assembling Different Cover Plates
62
Installing the Heat Exchanger Ash Removal Unit
63
Fitting the Combustion Chamber Ash Removal Unit (Optional)
67
Fitting the WOS Drive
70
Fitting the FGR Blower Fan
75
Fitting the Intermediate Piece (When Using an Electrostatic Precipitator)
79
Installing the Induced Draught Fan
79
Installing the Combustion Air Fan
82
Fitting the Temperature Sensor under the Moving Grate
82
Assembling the Automatic Ignition
83
Assembling the Insulated Doors and Covers
84
Connect the Electrostatic Precipitator (Optional)
86
Hydraulic Connection
87
Connections for the Safety Devices
87
Connecting up the Slide-On Duct Cooling
89
Power Connection and Wiring
90
Potential Equalisation
90
Laying of Cables
90
Final Installation Steps
92
Setting and Checking the Seal on the Doors
92
Adjusting the Doors
93
6 Commissioning
94
Before Commissioning / Configuring the Boiler
94
Initial Startup
95
Permitted Fuels
95
Non-Permitted Fuels
97
Heating up for the First Time
97
Screed Drying
98
7 Decommissioning
99
Out of Service for Long Periods
99
Disassembly
99
Disposal
99
Advertisement
Related Products
Fröling TGR 110
Fröling TGR 150
Fröling TGR 200
Fröling Turbomat 320
Fröling Turbomat 500
Fröling Turbomat TM 150
Fröling Turbomat TM 250
Fröling TM 320-550
Fröling TM 320
Fröling TM 400
Fröling Categories
Boiler
Industrial Equipment
Boiler Supplies
Pellet stove
DC Drives
More Fröling Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL