Sign In
Upload
Manuals
Brands
Artesyn Manuals
Server
Centellis 2100 Shelf Release 3.0
Artesyn Centellis 2100 Shelf Release 3.0 Manuals
Manuals and User Guides for Artesyn Centellis 2100 Shelf Release 3.0. We have
1
Artesyn Centellis 2100 Shelf Release 3.0 manual available for free PDF download: Installation And Use Manual
Artesyn Centellis 2100 Shelf Release 3.0 Installation And Use Manual (190 pages)
Brand:
Artesyn
| Category:
Server
| Size: 3 MB
Table of Contents
Table of Contents
3
About this Manual
13
Safety Notes
19
Sicherheitshinweise
33
1 Introduction
47
Features
47
Shelf Overview
48
Figure 1-1 AC System Front View
48
Figure 1-2 DC System Front View
49
Figure 1-3 AC System Rear View
49
Figure 1-4 DC System Rear View
49
Backplane
50
Node Slots
50
Rear Transition Modules
51
Shelf
50
Shelf Manager and Hub Board
51
Figure 1-5 ATCA-MF106 Hub Interfaces
52
Mini-Hub Port Mapping
53
Power Inlet Modules
53
AC Power Supply Unit and DC Power Entry Modules
53
Fan Trays
54
Air Filters
54
User Card Slots
54
Shelf Management
56
Figure 1-6 Shelf Management Architecture
56
System Management
57
Figure 1-7 Advancedtca System Management
58
Standard Compliances
60
Table 1-1 Standard Compliances
60
Ordering Information
63
Figure 1-8 AC and DC Sample Shelf Label
63
Table 1-2 Ordering Information Excerpt
64
2 Site Preparation
67
Site Planning Considerations
67
Receiving and Unpacking the System
67
Planning Site and Installation
68
Requirements
69
Environmental Requirements
69
Table 2-1 Environmental Conditions
69
Table 2-2 Critical Temperature Limits
71
Power Requirements
72
Table 2-3 AC Shelf Power Requirements
72
Dimensions and Weight
73
Table 2-4 DC Shelf Power Requirements
73
Table 2-5 Dimensions and Weight of System and Components
73
Mounting Options
74
Cooling Considerations
75
Figure 2-1 Rack Mounting Dimensions
75
Acoustic Noise Control
76
3 System Installation
77
Before Installation
77
Type Label Location
77
Requirements
77
Tools You will Need
78
Torque Values
78
Installation
79
Installing the System in a Rack
80
Figure 3-1 Rack Mounting Dimensions
82
System Grounding/Bonding
83
Powering-Up the System
84
AC System Startup Procedure
85
DC System Startup Procedure
87
Removal
91
Powering down the System
91
Disconnecting the System from Power Supply
92
AC System Disconnection Procedure
92
DC System Disconnection Procedure
93
Removing the System
94
4 FRU Installation
95
Installing and Removing Rtms and Blades
95
Replacing the Shelf Manager and Hub Board
96
Covering Unused Slots
99
Replacing AC Power Supply Units
100
Replacing DC Power Entry Modules
102
Installing Circuit Breaker Cover for DC Pems
106
Figure 4-2 Circuit Breaker Cover
106
Replacing Fan Trays
108
Maintaining Air Filters
113
Replacing the System Filters
114
Replacing the AC PSU Air Filter
121
Storing the Filters
123
5 Non-Field-Replaceable Units
125
Backplane
125
Base Interface
126
Figure 5-1 Location of Zones on a Blade
126
Fabric Interface
127
Update Channel
128
Synchronization Clock Interface
128
Alarm Panel
128
Power Inlet
129
6 Cooling Subsystem
131
7 Power Subsystem
133
AC Power Supply
133
DC Power Supply
133
Power Distribution
134
Management Power Distribution
134
High Power Distribution
134
AC Power Interconnect
134
Figure 7-1 Two-PSU Shelf Power Distribution
135
DC Power Interconnect
136
AC PSU Specifications
137
Figure 7-2 Two-PEM Shelf Power Distribution
137
AC PSU Input Power Requirements
138
Table 7-1 AC PSU Input Power Requirements
138
AC PSU Output Specifications
139
DC PEM Specifications
139
Power Input
139
Power Filtering
139
Table 7-2 AC PSU Output Specifications
139
8 Network Management and System Access
141
Accessing System Components
141
Network Management
142
Slot Numbers and Slot Addresses
143
Figure 8-1 Dual Star Topology
143
Table 8-1 Slot Numbering and Slot Addresses
144
Shelf Geographical Address
145
Setting the Shelf Geographical Address
145
Shelf Manager Replacement Scenarios
145
IP Addresses
146
Out-Of-Band Interface
148
Backplane Interfaces
151
Configuration File
154
Restoring Factory Settings
158
9 Configuration and Network Boot
161
Figure 9-1 DHCP/TFTP Server Setup
161
Preparing a TFTP Server for Network Boot and Installation
162
Preparing a DHCP Server for Network Boot
164
Mini-Hub Configuration
166
10 Redundancy
169
Cold Standby
169
Heartbeat
170
Data Replication
170
HPI Interface
170
System Manager
170
Redundancy Operations
171
Shelf Manager Switchover
171
Shelf Manager Takeover
171
Shelf Manager Failover
172
Shelf Manager Insertion
173
Shelf Manager Extraction
173
11 Software
175
Software Requirements
175
BBS Installation
175
Table 11-1 Software Available on Shelf Components
175
Firmware Upgrade
176
IPMI Firmware Upgrade
176
Table 11-2 Available Software Upgrade Tools
176
Hubcfg Utility
177
Blade Insertion and Extraction
180
Power-On after Blade Insertion
181
Figure 11-1 Blade Power-On after Insertion
181
Power-Down before Blade Extraction
182
Figure 11-2 Blade Power-Down before Extraction
182
Troubleshooting
183
Error List
183
Mechanical
183
After Power on
183
A.1 Error List
183
Fans
185
Shelf Managers
185
Related Documentation
187
Artesyn Embedded Technologies - Embedded Computing Documentation
187
Table B-1 Artesyn Embedded Technologies - Embedded Computing Publications
187
Advertisement
Advertisement
Related Products
Artesyn Centellis 2640
Artesyn ATCA-7367
Artesyn ATCA-7480
Artesyn ATCA-F125
Artesyn AXP 1410
Artesyn AXP1440
Artesyn AXP640
Artesyn MaxCore MC1600
Artesyn RTM-ATCA-747x-10G
Artesyn Categories
Motherboard
Server
Single board computers
PCI Card
Computer Hardware
More Artesyn Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL