Sign In
Upload
Manuals
Brands
Amazone Manuals
Farm Equipment
AD-P 403 Special
Amazone AD-P 403 Special Manuals
Manuals and User Guides for Amazone AD-P 403 Special. We have
1
Amazone AD-P 403 Special manual available for free PDF download: Operating Manual
Amazone AD-P 403 Special Operating Manual (192 pages)
Top mounted seed drills
Brand:
Amazone
| Category:
Farm Equipment
| Size: 10 MB
Table of Contents
Table of Contents
5
User Information
10
Purpose of the Document
10
Locations in the Operating Manual
10
Diagrams Used
10
General Safety Instructions
11
Obligations and Liability
11
Representation of Safety Symbols
13
Organisational Measures
14
Safety and Protection Equipment
14
Informal Safety Measures
14
Training of Personnel
15
Safety Measures in Normal Operation
16
Dangers from Residual Energy
16
Maintenance and Repair Work, Fault Elimination
16
Structural Changes
17
Spare and Wear Parts and Auxiliary Materials
18
Cleaning and Disposal
18
User Workstation
18
Warning Symbols and Other Labels on the Machine
19
Positioning of Warning Symbols and Other Labels
25
Dangers if the Safety Information Is Not Observed
26
Safety-Conscious Working
26
Safety Information for the Operator
27
General Safety and Accident Prevention Information
27
Hydraulic System
31
Electrical System
32
Attached Tools
33
Operation of the Seed Drill
34
Cleaning, Maintenance and Repairs
34
Loading and Unloading
35
Product Description
36
Main Assemblies of the Machine
36
Assemblies of the Machine
37
Safety and Protection Equipment
41
Overview - Supply Lines between the Tractor and the Machine
43
Hydraulic Connections
43
Data Cable
44
Power Connection for Road Transportation
44
Transportation Equipment
45
Intended Use
47
Danger Area and Danger Points
48
Rating Plate and CE Mark
49
Technical Data
50
Technical Data for the Calculation of Tractor Weights and Tractor Axle Loads
50
Necessary Tractor Equipment
52
Noise Production Data
52
Structure and Function
53
AMALOG+ On-Board Computer (Optional)
54
AMADRILL+ On-Board Computer (Optional)
55
AMATRON 3 On-Board Computer (Optional)
56
Hopper and Loading Board
57
Digital Fill Level Monitoring (Optional)
57
Dosing
58
Dosing Rollers
59
Overview of Dosing Rollers
60
Seed/Dosing Rollers Table
61
Seed Rate Adjustment at Vario Gearbox
62
Seed Rate Remote Control, Hydraulic on the Vario Gearbox (Optional)
63
Seed Rate Setting, Electronic on the Vario Gearbox (Optional)
63
Seed Rate Adjustment with Full Dosing (Optional)
64
Calibration Test
66
Blower Fan
67
Blower Fan with Hydraulic Drive
68
Blower Fan with Belt Drive
69
Distributor Head
71
Star Wheel / Impulse Wheel
71
WS Coulter (Optional Equipment)
73
Band Sowing Shoe (Optional)
73
Rotec Control Coulter (Optional Equipment)
74
Coulter Pressure
75
Coulter Pressure (Adjusted with the Calibration Crank)
75
Coulter Pressure Adjustment, Hydraulic (Optional)
76
Exact Harrow (Optional Equipment)
77
Exact Harrow Tine Position
77
Exact Harrow Pressure Adjustment
78
Hydr. Exact Harrow Pressure Adjustment (Optional)
78
Roller Harrow (Optional Equipment)
79
Track Markers
79
Creating Tramlines (Option)
80
Examples for Creating Tramlines
83
Tramline Rhythm 4, 6 and 8
85
Tramline Control 2 and 21
86
Working with Half Working Width (Partial Width)
87
Tramline Marker (Optional)
87
Commissioning
88
Checking the Suitability of the Tractor
89
Calculating the Actual Values for the Total Tractor Weight, Tractor Axle Loads and Load Capacities, as Well as the Minimum Ballast
90
Data Required for the Calculation)
91
Of the Tractor to
92
Calculation of the Actual Total Weight of the Combined Tractor and Machine
92
Calculation of the Actual Rear Axle Load of the Tractor T
92
H Tat
92
Tractor Tyre Load-Bearing Capacity
92
Table
93
Securing the Tractor / Machine against Unintentional Start-Up and Rolling
94
Installation Regulations for the Hydraulic Fan Drive Connection
95
Initial Fitting of Coupling Parts (Specialist Workshop)
96
Initial Fitting of Road Safety Bar Holders (Specialist Workshop)
99
Mounting the Holder on Seed Drills with 750 L Hopper
99
Mounting the Holder on Seed Drills with 1250 L Hopper
100
Coupling and Uncoupling the Machine
101
Hydraulic Hose Lines
102
Coupling the Hydraulic Hose Lines
102
Uncoupling the Hydraulic Hose Lines
103
Connecting Top-Mounted Seed Drill
103
Connecting Blower Fan Belt Drive (Specialist Workshop)
108
Connecting the Pressure Gauge
111
Uncoupling the Top-Mounted Seed Drill from the Cultivator
112
Settings
116
Setting the Level Sensor
116
Inserting the Dosing Roller into the Dosing Unit
118
Steps, Transportation and Operational Position
120
Filling the Hopper
121
Setting the Sowing Rate with a Calibration Test
122
Adjusting Sowing Rate with Calibration Test on Machines with Vario Gearbox Without Seed Rate Remote Control
123
Determining the Gearbox Setting Using the Calculating Disc Rule
126
Adjusting Sowing Rate with Calibration Test on Machines with Hydraulic Seed Rate Remote Control
127
Adjusting Sowing Rate with Calibration Test on Machines with Vario Gearbox and with Electronic Seed Rate Adjustment
129
Adjusting Sowing Rate with Calibration Test on Machines with Full Dosing
130
Setting the Blower Fan Speed for Blower Fans with Hydraulic Drive
131
Setting at the Pressure Relief Valve with Round Outer Contour
132
Setting the Blower Fan Speed Via the Flow Control Valve of the Tractor
132
Adjusting the Blower Fan Speed on the Machine's Pressure Relief Valve
132
Setting at the Pressure Relief Valve with Hexagon Outer Contour
133
Setting the Blower Fan Speed Via the Flow Control Valve of the Tractor
133
Adjusting the Blower Fan Speed on the Machine's Pressure Relief Valve
133
Setting the Blower Fan with Belt Drive
134
Adjusting Coulter Pressure / Seed Placement Depth
135
Setting the Coulter Pressure (Mechanical Coulter Pressure Adjustment)
135
Setting the Coulter Pressure (Hydraulic Coulter Pressure Adjustment)
135
Adjusting the Depth Guide Discs
136
Adjusting the Exact Harrow
138
Exact Harrow Tine Position
138
Exact Harrow Pressure Adjustment
140
Exact Harrow Pressure Adjustment (Hydraulic)
140
Moving the Exact Harrow to the Working / Transport Position
141
Adjusting the Roller Harrow
142
Setting Harrow Tines (Roller Harrow with Upper Guide Bar)
142
8.10.1.1 Adjusting the Angle of the Harrow Tines
142
8.10.1.2 Adjusting the Working Depth of the Harrow Tines
142
Adjusting Harrow Tines (Roller Harrow with Carrier Handle)
143
8.10.2.1 Adjusting the Angle of the Harrow Tines
143
8.10.2.2 Adjusting the Working Depth of the Harrow Tines
143
Adjusting the Roller Contact Pressure to the Soil and Checking
144
Moving the Track Marker to the Working / Transport Position
145
Move Track Marker to Working Position
145
Move Track Marker to Transport Position
147
Setting the Tramline Rhythm/Counter on the On-Board Computer
148
Half-Sided Switching off
148
Moving the Tramline Marker to the Working / Transport Position
149
Move the Tramline Marker to Working Position
149
Move the Tramline Marker to Transport Position
150
Attaching the Band Sowing Shoe to the WS Coulter
151
Road Safety Bar
151
Road Safety Bar in Road Transport Position
151
Road Safety Bar in Park Position
151
Moving the Star Wheel into Transport/Operational Position
152
Move the Star Wheel to the Transport Position
152
Moving the Star Wheel to the Operational Position
152
Moving the Impulse Wheel into Transport/Operational Position
154
Moving the Impulse Wheel to Working Position
154
Moving the Impulse Wheel to Transport Position
154
Transportation
155
Putting the Sowing Combination (up to 30 M Wide) in Road Transport Position
155
Legal Regulations and Safety
156
Use of the Machine
159
Preparing the Machine for Use
160
Starting Work
160
Checks
161
Checking the Placement Depth of the Seed
161
During the Work
162
Switching off the Tramline Counter (STOP Button)
162
Checking the Distributor Head for Impurities
162
Turning at End of the Field
163
End of Work in the Field
164
Emptying the Hopper And/Or Seed Dosing Unit
165
Emptying the Hopper
165
Emptying Seed Dosing Unit
165
Faults
168
Residual Seed Volume Indicator
168
Shearing of the Track Marker Boom
168
Deviations between the Preset and Actual Sowing Rates
169
Slippage of the Star Wheel
170
Cleaning, Maintenance and Repairs
171
Safety
171
Cleaning
172
Cleaning the Distributor Head (Specialist Workshop)
173
Shutdown of the Machine over a Long Period of Time
174
Lubrication Regulations
174
Lubricants
175
Lubrication Points - Overview
175
Service Plan - Overview
176
Visual Inspection of the Upper and Lower Link Pins
177
Servicing the Sowing Shaft Bearing
177
Checking the Oil Level in the Vario Gearbox
178
Maintenance of Roller Chains and Chain Wheels
178
Checking/Adjusting Belt Tension (Blower Fan Belt Drive)
179
Inspection Criteria for Hydraulic Hose Lines
180
12.4.6.1 Labelling Hydraulic Hose Lines
181
12.4.6.2 Installation and Removal of Hydraulic Hose Lines
182
Specialist Workshop Adjustment Work
183
Adjusting the Track Width of the Cultivating Tractor (Specialist Workshop)
183
Adjusting the Track Width of the Cultivating Tractor (Specialist Workshop)
184
Switch the Chain Wheels in Chain Drive (Specialist Workshop)
186
Handling the Tapered Clamping Bushes for V-Belt Pulleys
187
Screw Tightening Torques
188
Hydraulic System Diagrams
189
Hydraulic Plan for AD-P 303 Special / AD-P 403 Special
189
Advertisement
Advertisement
Related Products
Amazone AD-P 3001 Special 850
Amazone AD-P 3501 Special 850
Amazone AD-P 4001 Special 850
Amazone AD-P 03 SPECIAL
Amazone AD-P 303 Super
Amazone AD-P 403 Super
Amazone AD-P 303 Special
Amazone AD-P 353 Special
Amazone AD 3000 Super Classic Line
Amazone AD 4000 Super
Amazone Categories
Farm Equipment
Tiller
Spreader
Desktop
Paint Sprayer
More Amazone Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL