Sign In
Upload
Manuals
Brands
Amazone Manuals
Farm Equipment
AD-P 3501 Special 850
Amazone AD-P 3501 Special 850 Manuals
Manuals and User Guides for Amazone AD-P 3501 Special 850. We have
2
Amazone AD-P 3501 Special 850 manuals available for free PDF download: Operating Manual
Amazone AD-P 3501 Special 850 Operating Manual (214 pages)
Pack top seed drills
Brand:
Amazone
| Category:
Farm Equipment
| Size: 37 MB
Table of Contents
Table of Contents
5
1 User Information
10
Purpose of the Document
10
Locations in the Operating Manual
10
Diagrams
10
2 General Safety Instructions
12
Obligations and Liability
12
Representation of Safety Symbols
14
Organisational Measures
15
Safety and Protective Equipment
15
Informal Safety Measures
15
User Training
16
Safety Measures in Normal Operation
17
Danger from Residual Energy
17
Maintenance and Repair Work, Fault Elimination
17
Design Changes
18
Spare and Wear Parts and Aids
19
Cleaning and Disposal
19
User Workstation
19
Warning Symbols and Other Labels on the Implement
20
Position of Warning Symbols
25
Dangers in Case of Non-Compliance with the Safety Instructions
26
Safety-Conscious Working
26
Safety Information for Users
27
General Safety Instructions and Accident Prevention Instructions
27
Hydraulic System
31
Electrical System
32
Mounted Implements
33
Operation of the Seed Drill
34
Cleaning, Maintenance and Repair
34
3 Upon Delivery, Loading and Unloading the Implement
35
4 Product Description
36
Components of the Seeding Combination
36
Components of the AD-P Special Pack Top Seed Drill
37
Safety and Protective Equipment
39
Overview - Supply Lines/Supply Cable
40
Supply Cable
40
Hydraulic Hose Lines
40
Identification of the Hydraulic Hose Lines
41
Transportation Equipment
42
Intended Use
44
Danger Areas and Danger Points
45
Rating Plate and CE Mark
46
Technical Data
47
Technical Data for Calculating the Tractor Weight and the Tractor Axle Loads
48
Required Tractor Equipment
49
Noise Production Data
49
5 Layout and Function
50
Control Terminal for Implements with ISOBUS System
52
Twinterminal
52
Amadrill+ Control Terminal for Implements Without ISOBUS System
53
Distance Measurement
53
Measuring the Distance Covered with a Radar Device
54
Measuring the Distance Covered with a Pulse Wheel
54
Implement Documentation
54
Central Key
55
Hopper and Loading Board
55
Fill Level Control
56
Metering
57
Metering Roller Diagram Table
59
Calibrating the Seed Rate
64
Automatic Seed Rate Increase
66
Spreading Seed with Wide Row Spacing
66
Seed Pre-Metering
67
Start-Up Ramp
67
Blower Fan
68
Distributor Head
70
Seed Tube Monitoring
71
WS Coulter
72
Band Seeding Shoe
72
Rotec Control Coulter
73
Coulter Pressure, Seed Rate Increase and Coulter Lifting
74
Coulter Pressure - Mechanical Adjustment
74
Coulter Pressure - Hydraulic Adjustment
75
Lifting the Coulters and Harrow - Soil Tillage Without Seeding
76
Exact Following Harrow
76
Exact Following Harrow Tine Position
77
Exact Following Harrow Pressure
78
Roller Harrow with Contour Guidance
79
Track Marker
80
Tramlines
81
Examples for Creating Tramlines
84
Tramline Rhythms 4, 6, and 8
86
Tramline Rhythm 2 and 21
87
One-Sided Switching
88
Tramline Marker
90
Work Floodlights
91
Camera System
91
6 Start-Up
92
Checking the Suitability of the Tractor
93
Calculating the Actual Values for the Total Tractor Weight, Tractor Axle Loads and Tyre Load-Bearing Capacity, as Well as the Required Minimum Ballast Weight
94
Data Required for the Calculation (Attached Implement)
95
Of the Tractor
96
To Ensure Steering Capability
96
Calculation of the Actual Front Axle Load of the Tractor T
96
Calculation of the Actual Total Weight of the Combined Tractor and Implement
96
Tat
96
Calculation of the Actual Rear Axle Load of the Tractor T
96
Load-Bearing Capacity of the Tractor Tyres
96
H Tat
96
Table
97
Secure the Tractor / Implement against Unintentional Starting and Rolling Away
98
Hydraulic Connection for the Blower Fan Drive
99
7 Coupling and Uncoupling the Implement
100
Hydraulic Hose Lines
102
Coupling the Hydraulic Hose Lines
102
Uncoupling the Hydraulic Hose Lines
103
Coupling Implements
104
Coupling of the Tractor and Soil Tillage Implement with ISOBUS System
106
Installation of the Analogue Working Position Sensor and the Working Position Sensor for the Seed Tube Monitoring
107
Coupling of the Tractor and Soil Tillage Implement with the Amadrill+ Control Terminal
111
Installation of the Digital Working Position Sensor
112
Installation of the Working Position Sensor for Seed Drills with Seed Tube Monitoring
113
Coupling the Pack Top Seed Drill and the Soil Tillage Implement
114
Uncoupling the Pack Top Seed Drill from the Soil Tillage Implement
118
Checking the Tramline Track Width
124
Checking the Tramline Wheelmark Width
124
8 Settings
125
Folding the Steps up and down
126
Folding down the Steps
126
Folding up the Steps
127
Fill the Seed Hopper
128
Calibrating the Seed Rate
130
Adjusting the Automatic Seed Rate Increase
131
Setting the Blower Fan Speed
132
Setting the Blower Fan Speed Via the Flow Control Valve of the Tractor
133
Setting the Blower Fan Speed on Tractors Without Flow Control Valve
133
Switching on the Blower Fan Speed Monitoring
133
Pressure Relief Valve with Round Outer Contour
134
Basic Setting of the Pressure Relief Valve
134
Blower Fan Speed Setting
134
Pressure Relief Valve with Hexagonal Outer Contour
135
Basic Setting of the Pressure Relief Valve
135
Blower Fan Speed Setting
135
Setting the Coulter Pressure
136
Mechanical Coulter Pressure Adjustment
136
Hydraulic Coulter Pressure Adjustment
137
Soil Tillage Without Seeding - Lifting the Coulters and Harrow
138
Adjusting and Checking the Seed Placement Depth
139
Rotec Control Coulter
140
Adjusting the Coulter Discs
140
Exact Following Harrow
142
Exact Following Harrow Tine Position
142
Setting the Exact Following Harrow Pressure
143
Moving the Exact Following Harrow to the Working/Transport Position
144
Move the Exact Following Harrow into Working Position
144
Moving the Exact Following Harrow into Transport Position
144
Roller Harrow
145
Setting the Pitch of the Tines to the Ground
145
Adjusting the Working Depth of the Harrow Tines
145
Setting the Roller Contact Pressure
146
Lifting/Lowering the Roller Harrow
148
Lifting the Roller Harrow (Deactivate)
148
Lowering the Roller Harrow (Activate)
149
Moving the Track Marker to the Working / Transport Position
150
Moving the Track Marker into Working Position
150
Adjusting the Track Marker Length
152
Moving the Track Marker to Transport Position
153
One-Sided Switching
154
Mechanically Adjustable One-Sided Switching
154
Electrically Adjustable One-Sided Switching
155
Moving the Tramline Marker into Working/Transport Position
155
Moving the Tramline Marking Device into Working Position
155
Moving the Tramline Marker into Transport Position
158
Moving the Transport Safety Bar into Road Transport/Parking Position
159
Moving the Transport Safety Bar to Transport Position
159
Moving the Transport Safety Bar into Parking Position
159
Moving the Pulse Wheel into the Working/Transport Position
160
Moving the Pulse Wheel to Working Position
160
Moving the Pulse Wheel to Transport Position
160
9 Transportation
161
Moving the Seeding Combination into Transport Position
161
Legal Regulations and Safety
162
10 Use of the Implement
166
Moving the Implement from Transport into Working Position
167
Work Commencement
167
During Operation
168
Overview of the Inspections
168
Turning at End of the Field
169
Track Marker
170
End of Work in the Field
170
Emptying the Hopper And/Or Metering Unit and Replacing the Metering Roller
171
Quick Emptying of the Hopper
171
Emptying the Hopper And/Or the Metering Unit and Replacing the Metering Roller
172
11 Faults
176
Residual Seed Quantity Indicator
177
Deviations between the Set and Actual Seed Rate
177
12 Cleaning, Maintenance and Repair
178
Safety First
178
Cleaning the Implement
179
Clean the Distributor Head
181
Shutdown of the Implement over a Long Period of Time
181
Installation, Setting and Repair Work (Specialist Workshop)
182
Initial Fitting of Coupling Parts (Specialist Workshop)
182
12.4.1.1 Soil Tillage Implements Type 00: Overview of the Coupling Parts
186
12.4.1.2 Soil Tillage Implements Type 00: Coupling Part Installation
186
12.4.1.3 Soil Tillage Implements Type 01: Overview of the Coupling Parts
191
12.4.1.4 Soil Tillage Implements Type 01: Coupling Part Installation
191
Initial Installation of the Transport Safety Bar Bracket
194
Working on the Distributor Head
195
Exchanging the Exact Following Harrow and the Roller Harrow with each Other (Specialised Workshop)
196
Adjusting the Tramlines on the Segment Distributor Head
197
12.4.5.1 Adjusting the Tramline Track Width on the Segment Distributor Head
198
12.4.5.2 Adjusting the Tramline Wheelmark Width on the Segment Distributor Head
198
12.4.5.3 Replacing the Segment in the Segment Distributor Head
199
12.4.5.4 Connecting the Tramline Segments
200
12.4.5.5 Deactivating the Active Tramline Flaps
201
Installing the Plugs in the Segment Distributor Head for Spreading Seed with Wide Row Spacing
202
Lubrication
203
Greasing Points - Overview
203
Maintenance Schedule - Overview
204
Inspection Criteria for Hydraulic Hose Lines before Every Start-Up
205
Inspection Criteria for Hydraulic Hose Lines Using the Maintenance Schedule
205
12.6.2.1 Identification of Hydraulic Hose Lines
207
12.6.2.2 Installing and Removing Hydraulic Hose Lines
207
Visual Inspection of the Upper and Lower Link Pins
208
Bolt Tightening Torques
208
13 Hydraulic Diagram
210
AD-P Special Hydraulic Diagram
210
Advertisement
Amazone AD-P 3501 Special 850 Operating Manual (200 pages)
Pneumatic pack top seed drill
Brand:
Amazone
| Category:
Farm Equipment
| Size: 34 MB
Table of Contents
Table of Contents
5
1 User Information
10
2 General Safety Information
11
Obligations and Liability
11
Representation of Safety Symbols
13
Organisational Measures
14
Safety and Protective Equipment
14
Informal Safety Measures
14
User Training
15
Safety Measures in Normal Operation
16
Danger from Residual Energy
16
Maintenance and Repair Work, Fault Elimination
16
Design Changes
16
Spare and Wear Parts and Aids
17
Cleaning and Disposal
17
Workstation of the Operator
17
Warning Symbols on the Implement
18
Position of Warning Symbols
24
Dangers in Case of Non-Compliance with the Safety Instructions
25
Safety-Conscious Working
25
Safety Information for Users
26
General Safety Instructions and Accident Prevention Instructions
26
Hydraulic System
30
Electrical System
31
Mounted Implements
32
Operation of the Seed Drill
33
Cleaning, Maintenance and Repair
34
3 Loading and Unloading the Implement Upon Delivery
35
4 Product Description
36
Components of the AMAZONE Seeding Combination
36
Assembly Groups of the AD-P Special Pneumatic Pack Top Seed Drill
37
Safety and Protection Equipment
39
Overview - Supply Cable / Hydraulic Hose Lines
40
Supply Cable
40
Identification of the Hydraulic Hose Lines
40
Type of Actuation of the Tractor Control Units
40
Connection and Function of the Tractor Control Units with and Without ISOBUS System
41
Traffic Safety Equipment
42
Proper Use
43
Danger Areas and Danger Points
44
Rating Plate and CE Mark
45
Technical Data
46
Noise Production Data
46
Technical Data for Calculating the Tractor Weight and the Tractor Axle Loads
47
Required Tractor Equipment
48
5 Structure and Function
49
AMAZONE Amadrill+ Control Terminal
52
Control Terminal for Implements with ISOBUS System
52
AMAZONE Amatron 4 Control Terminal
53
AMAZONE Twinterminal
53
AMAZONE Myseeder App
53
Implement Documentation
54
Central Key
54
Distance Measurement
55
Seed Hopper and Loading Board
56
Fill Level Monitoring
57
Metering
58
Metering Roller Table - Figures
60
Calibrating the Seed Rate
64
Automatic Seed Rate Increase
65
Fan
66
Distributor Head
68
Seed Tube Monitoring
69
Spreading Seed with Wide Row Spacing
69
WS Drag Coulter
70
Band Seeding Shoe
70
Rotec Control Coulter
71
Coulter Pressure, Coulter Lift and Harrow Lift
73
Coulter Pressure - Mechanical Adjustment
73
Coulter Pressure - Hydraulic Adjustment
74
Coulter and Harrow Lift - Soil Tillage Without Seeding
75
Exact Following Harrow
75
Exact Following Harrow Tine Position
76
Exact Following Harrow Pressure
77
Roller Harrow
78
Seeding Variations, Adjustable on the Control Terminal
79
Adapting the Seed Rate to the Acceleration of the Tractor
79
Seeding in Field Corners
79
Tramlines
80
Tramline Rhythm, Tabular Determination
82
Tramline Rhythm, Graphic Determination
82
One-Sided Switching
84
5.16.3.1 One-Sided Switching by Installing an Insert
84
5.16.3.2 One-Sided Switching by Pressing a Button
85
Tramline Marker
85
Track Marker
86
Camera System with Monitor
87
Work Floodlights
87
6 Initial Operation
88
Checking the Suitability of the Tractor
89
Calculation of the Actual Values for the Total Tractor Weight, Tractor Axle Loads and Tyre Load-Bearing Capacity, as Well as the Required Minimum Ballast Weight
90
Data Required for the Calculation (Attached Implement)
91
Calculation of the Required Minimum Ballast Weight at the Front G
92
To Ensure Steering Capability
92
Min of the Tractor
92
Calculation of the Actual Front Axle Load of the Tractor T
92
Calculation of the Actual Total Weight of the Combined Tractor and Implement
92
Tat
92
Calculation of the Actual Rear Axle Load of the Tractor T
92
Load-Bearing Capacity of the Tractor Tyres
92
H Tat
92
Table
93
Secure the Tractor / Implement against Unintentional Starting and Rolling Away
94
Hydraulic Connection for the Blower Fan Drive
95
7 Coupling and Uncoupling the Implement
96
Hydraulic Hose Lines
98
Coupling the Hydraulic Hose Lines
98
Disconnecting the Hydraulic Hose Lines
99
Coupling and Uncoupling Implements
100
Coupling the Soil Tillage Implement
102
Coupling the Pack Top Seed Drill
105
Uncoupling the Combination
109
Uncoupling the Pack Top Seed Drill
109
8 Settings
114
Folding the Steps up and down
115
Fill the Seed Hopper
117
Calibrating the Seed Rate
119
Adjusting the Automatic Seed Rate Increase
120
Adjusting the Fan Speed
121
Setting the Blower Fan Speed Via the Flow Control Valve of the Tractor
122
Setting the Fan Speed on Tractors Without Flow Control Valve
122
Switching on the Blower Fan Speed Monitoring
122
Pressure Relief Valve with Round Outer Contour
123
Basic Setting of the Pressure Relief Valve
123
Blower Fan Speed Setting
123
Pressure Relief Valve with Hexagonal Outer Contour
124
Basic Setting of the Pressure Relief Valve
124
Blower Fan Speed Setting
124
Adjusting and Checking the Seed Placement Depth
125
Rotec Control Coulter
126
Adjusting the Depth Control Discs / Wheels
126
Coulter Pressure
128
Mechanical Coulter Pressure Adjustment
128
Hydraulic Coulter Pressure Adjustment
128
Soil Tillage Without Seeding - Lifting the Coulters and Harrow
129
Adjusting the Exact Following Harrow
130
Adjusting the Exact Following Harrow Tines
130
Setting the Exact Following Harrow Pressure
131
Moving the Exact Following Harrow to the Working/Transport Position
132
Move the Exact Following Harrow into Working Position
132
Moving the Exact Following Harrow into Transport Position
132
Adjusting the Roller Harrow
133
Tines - Adjusting the Pitch
133
Tines - Adjusting the Working Depth
133
Setting the Roller Contact Pressure
134
Lifting/Lowering the Roller Harrow
136
Lifting the Roller Harrow (Deactivate)
136
Lowering the Roller Harrow (Activate)
137
Moving the Track Marker to the Working / Transport Position
138
Track Markers on the Seed Drill
139
Moving the Track Marker into Working Position
139
Adjusting the Track Marker Length
139
Moving the Track Marker to Transport Position
140
One-Sided Switching
141
One-Sided Switching - Installing an Insert
141
One-Sided Switching - Setting on the Control Terminal
141
Moving the Tramline Marker into Working/Transport Position
142
Move the Tramline Marker to Working Position
142
Move the Tramline Markers to the Transport Position
144
Moving the Exact Following Harrow Road Safety Bar into Road Transport/Parking Position
145
Moving the Road Safety Bar into Road Transport Position
145
Moving the Road Safety Bar into Parking Position
145
Moving the Pulse Wheel into the Working/Transport Position
146
Moving the Pulse Wheel to Working Position
146
Moving the Pulse Wheel to Transport Position
147
9 Transportation
148
Moving the Seeding Combination into Transport Position
148
Legal Regulations and Safety
149
10 Use of the Implement
153
Initial Operation
154
Work Floodlights
154
Moving the Implement from Transport into Working Position
155
Work Commencement
155
During Operation
156
Overview of the Inspections
156
Turning at End of the Field
157
Track Marker
158
End of Work on the Field
159
Emptying the Seed Hopper And/Or Metering Unit and Replacing the Metering Roller
160
11 Faults
164
Residual Seed Quantity Display
165
Deviations between the Set and Actual Seed Rate
165
12 Maintenance and Repairs
166
Maintenance Schedule
166
Safety
167
Safety When Cleaning the Implement
168
Safety When Working on the Distributor Head
170
Safety When Working on the Hydraulic System
170
Visual Inspections
171
Visual Inspection of the Upper and Lower Link Pins
171
Visual Check of the Hydraulic Hose Lines and Couplings
171
12.3.2.1 Date of Manufacture of the Hydraulic Hose Line
171
Repairs
172
Cleaning the Fan Suction Protective Screen
172
Cleaning the Fan Rotor
172
Cleaning the Distributors Head and Checking the Seed Hoses for Impurities
172
Installations
173
Installing Plugs to Increase the Row Spacings
173
Shutdown of the Implement over a Long Period of Time
173
Workshop Work
174
Initial Installation of Coupling Parts
174
12.6.1.1 Soil Tillage Implements Type 00: Overview of the Coupling Parts
178
12.6.1.2 Soil Tillage Implements Type 00: Coupling Part Installation
178
12.6.1.3 Soil Tillage Implements Type 01: Overview of the Coupling Parts
183
12.6.1.4 Soil Tillage Implements Type 01: Coupling Part Installation
184
Adjusting the Tramline Control
186
12.6.2.1 Setting the Tramline Track Width
187
12.6.2.2 Setting the Tramline Wheelmark Width
187
12.6.2.3 Removing and Installing the Segment in the Distributor Head
188
12.6.2.4 Electrical Connection of the Tramline Segments
189
12.6.2.5 Deactivating Tramline Segments
190
Exchanging the Exact Following Harrow and the Roller Harrow with each Other
191
Checking the Hydraulic Hose Lines
192
12.6.4.1 Safety When Working on Hydraulic Hose Lines
193
Oils and Greases
194
Lubricants for Grease Nipples and Grease Guns
194
Bolt Tightening Torques
195
13 Hydraulic Diagram
196
AD-P Special Hydraulic Diagram
196
Advertisement
Related Products
Amazone AD-P 3001 Special 850
Amazone AD-P 4001 Special 850
Amazone AD-P 03 SPECIAL
Amazone AD-P 303 Super
Amazone AD-P 403 Super
Amazone AD-P 303 Special
Amazone AD-P 353 Special
Amazone AD-P 403 Special
Amazone AD 2500 Special
Amazone AD 3500 Super
Amazone Categories
Farm Equipment
Tiller
Spreader
Desktop
Paint Sprayer
More Amazone Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL