Sign In
Upload
Manuals
Brands
Alvarado Manuals
Automatic Barriers
SUPERVISOR 4500
Alvarado SUPERVISOR 4500 Manuals
Manuals and User Guides for Alvarado SUPERVISOR 4500. We have
2
Alvarado SUPERVISOR 4500 manuals available for free PDF download: User Manual, Installation Instructions Manual
Alvarado SUPERVISOR 4500 User Manual (56 pages)
Optical Turnstile with Bi-directional Motorized Barriers
Brand:
Alvarado
| Category:
Automatic Barriers
| Size: 4 MB
Table of Contents
Table of Contents
3
Contents
3
Safety Precautions
4
Purpose of this User Guide
5
Intended Users
5
User Responsibilities
5
SU5000 Overview
6
SU4500 Components - Exterior View
6
SU4500 Components - Interior View
8
SU4500 Cabinets
10
SU4500 Options
13
Access Control Integration
14
SU4500 Functionality
15
Passage Modes
15
Setting Passage Modes
16
Bi-Directional Traffic and Smart Use of Passage Modes
16
User Status Display
18
Open / Close Status Light
19
Operational Sounds
20
SU4500 Operation
22
Powering on / off
22
User Instructions
23
Turnstile Operations
25
I/O Control
31
Inputs
31
Outputs
34
SU4500 Configuration Preparation
37
Overview
37
New Installation Configuration Checklist
37
Installing the Configuration Tools
38
Connecting a Laptop Directly to the Turnstile
39
Operating System Configuration
40
Setting the Local System Time
42
Setting the Turnstile IP Address
44
Maintenance
46
Weekly Safety Check
47
Troubleshooting
48
Appendix A - Configuring Dynamic Lights
50
Revision History
55
Advertisement
Alvarado SUPERVISOR 4500 Installation Instructions Manual (47 pages)
Optical Turnstile with Bi-Directional Motorized Barriers
Brand:
Alvarado
| Category:
Turnstiles
| Size: 8 MB
Table of Contents
Table of Contents
2
Contents
2
Safety Precautions
3
Safety Icons
3
Installation Tools
4
Uncrating
4
Parts List
5
Introduction
7
Before You Begin
9
Slab Requirements
9
Space Requirements
9
Electrical Requirements
10
Conduit Requirements
11
Environmental Requirements
11
Communication Requirements
12
Internal Card Reader Installation Requirements
12
User Training
12
Pre-Installation Checklist
12
Pre-Installation Instructions
13
Cabinet Panel Removal
13
Installation Instructions
14
Anchoring the Turnstile
14
Internal Card Reader Installation
17
Wiring Instructions
18
Low-Voltage - 24VDC Connection
18
Crossover Cable Connection
18
LED Light Connection from Secondary Cabinet
19
I/O Control Board
20
I/O Control Board Terminal Descriptions
21
Configuring Passage Modes
22
Ethernet Communication (Optional)
24
Barrier Installation
24
Post-Installation Functions Check
26
Finish the Installation
30
Cabinet Lid Installation
30
Cabinet Panel Installation
31
Base Cover Installation
31
Post-Installation Checklist
32
Troubleshooting
33
Appendix A - External DC Power Supply Installation
34
Appendix B - Setting the Home Position
40
Appendix C - 36" Single Lane - Plan, Elevation, & Footprint Drawing
41
Appendix D - Multi-Lane Conduit Requirements
42
Appendix E - Crossover Cable Connection Diagrams
43
Appendix F - Single Lane Platform Dimensions - 28" & 36" Passages
44
Revision History
45
Advertisement
Related Products
Alvarado Supervisor 2000
Alvarado SUPERVISOR 5000
Alvarado SUPERVISOR 3000
Alvarado Supervisor 3500
Alvarado Supervisor 500
Alvarado SU4500
Alvarado Categories
Turnstiles
Fencing & Gates
Touch terminals
UPS
Automatic Barriers
More Alvarado Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL