Machine Break-In; Pre-Operation Checklist - Rankin LS-20-1 Operator's Manual

3 point hitch log splitter
Table of Contents

Advertisement

4.3

MACHINE BREAK-IN

Although there are no operational restrictions on
the Log Splitter when used for the first time, it is
recommended that the following mechanical items
be checked:
A. After Operating For 1 and 5 Hours:
1. Check all nuts, bolts and other fasteners.
Tighten to their specified torque level.
2. Check hydraulic system for leaks.
Tighten all leaking fittings and replace any
leaking components.
3. Then go to the service schedule as
defined in the Maintenance Section.
4.4

PRE-OPERATION CHECKLIST

Efficient and safe operation of the Log Splitter
requires that each operator reads and under-
stands the operating procedures and all related
safety precautions outlined in this section. A pre-
operation checklist is provided for the operator. It
is important for both the personal safety and
maintaining the good mechanical condition of the
Log Splitter that this checklist is followed.
Before operating the machine and each time
thereafter, the following areas should be checked
off:
1. Use only a small Agricultural tractor of less
than 100 horsepower on the machine.
2. Check that the machine is properly attached
to the tractor. Be sure retainers are used on
the mounting pins.
3. Be sure extra weights are mounted on the
front of the tractor if required.
4. Check the wedge and strippers. Be sure they
are not damaged or broken and is not badly
worn. Repair or replace as required.
5. Check for entangled material. Remove this
material.
6. Check for hydraulic leaks, tighten fittings or
replace components to stop leaks.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents