BATTERY CHECKS

Battery inspection is very important in electronically controlled engines: You must check the
battery condition regularly.
LOAD TEST
• Perform the following steps to complete the load
test procedure for maintenance-free batteries.
• Connect the load tester clamps to the terminals
and proceed with the test as follows:
① If the battery has been charged, remove the
surface charge by connecting a 300 ampere
load for 15 seconds.
② Connect
the
specified load.
③ Read the voltage after the load has been
applied for 15 seconds.
④ Disconnect the load.
⑤ Compare the voltage reading with the
minimum acceptable voltage shown in the
table below. If the voltage is greater than
shown in the table, the battery is good. If the
voltage is less than shown in the table,
replace the battery.
U125 Series Engines
voltmeter
and
apply
BATTERY MUST BE STORED AND WORKED ON IN A SAFE PLACE
AWAY FROM CHILDREN AND SOURCES OF IGNITION.
FLUID IN THE BATTERY IS A CORROSIVE ACID AND MUST BE
HANDLED WITH CARE. IF SPILLED ON ANY PART OF BODY, FLUSH
IMMEDIATELY WITH WATER.
DO NOT LOOSEN OR DETACH BATTERY TERMINALS WHILE ENGINE IS
RUNNING. DOING SO WILL DAMAGE THE CHARGING SYSTEM AND
OTHER ELECTRONIC DEVICES.
Voltage
9.6
9.5
9.4
9.3
the
9.1
8.9
8.7
8.5
WARNING
CAUTION
- 36 -
Temperature
°
°
20
C (70
F) and
above
°
°
16
C (60
F)
°
°
10
C (50
F)
°
°
4
C (40
F)
°
°
-1
C (30
F)
°
°
-7
C (20
F)
°
°
-12
C (10
F)
°
°
-18
C (0
F)

Advertisement

Table of Contents
loading

This manual is also suitable for:

U125pU125j

Table of Contents