Download Print this page

Kenmore 41774182300 Installation Instructions Manual page 8

Hide thumbs Also See for 41774182300:

Advertisement

INSTALLATION
1. GAS CONNECTION (Gas dozers only)
a. Remove the shipping cap from gas pipe at the rear of
the dryer.
NOTE: DO NOT connect the dryer to L.P. gas service without
converting the gas valve. An L.P. conversion kit must
be installed by a qualified gas technician.
b. Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or approved
pipe from gas supply line to the 3/8 inch (0.96 cm) pipe
located on the back of the dryer. Use a 1/2 inch to 3/8
inch (1.27 cm to 0.96 cm) reducer for a connection.
Apply an approved thread sealer that is resistant to the
corrosive
action
of liquefied
gases
on aII pipe
connections.
c. Open the shutoff valve in the gas supply line.
d. Test all connections
by brushing on a soapy water
soIution. NEVER TEST FOR GAS LEAKS WITH AN
OPEN FLAME.
2. Connect the exhaust duct to outside exhaust system. Use
duct tape to seal aII joints.
3. With the dryer in its final position, adjust one or more of
the legs until the dryer is resting solid on aIl four legs.
PIace a level on top of the dryer. THE DRYER MUST BE
LEVEL AND RESTING SOLID ON ALL FOUR LEGS.
NOTE: Awiring diagram is located inside the dryer.
REPLACEMENT
PARTS
If replacement parts are needed for your dryer, contact the
source where you purchased your dryer, or calI Sears Parts
and Service TolI Free Number 1-800-4-MY-HOME (1-800-469-
4663).
Labet all wires prior to disconnection
when
servicing controIs. Wiring errors can cause improper and
dangerous operation. Verify proper operation after servicing.
Destroy the carton and pIastic bags after the
dryer is unpacked. Children might use them for play. Cartons
covered with rugs, bedspreads, or ptastic sheets can become
airtight chambers causing suffocation. Place alt materials in
a garbage
container
or make materiaIs
inaccessibIe
to
children.
The instructions in this manual and all other
literature incIuded with this dryer are not meant to cover every
possible condition and situation that may occur. Good safe
practice
and caution MUST be applied when instalIing,
operating and maintaining any appIiance.
Lint Blade Retaining
Pin Location
and Orientation
4. Plug the power cord into a grounded outlet. NOTE: Check
to ensure the power is off at circuit breaker/fuse box before
plugging the power cord into the outlet .....
5. Turn on the power at the circuit breaker/fuse box.
Before operating the dozer, make sure the dozer
area is clear and free from combustible materials, gasoline,
and other flammable vapors. Also see that nothing (such as
boxes, clothing, etc.) obstructs the flow of combustion and
ventilation air.
6. Run the dryer through a cycle check for proper operation.
NOTE: On gas dryers, before the burner will Iight, it is
necessary for the gas line to be bted of air. If the burner
does not light within 45 seconds the first time the dryer is
turned on, the safety switch will shut the burner off. If this
happens, turn the timer to "OF F" and wait 5 minutes before
making another attempt to Iight.
7. Ptace these instructions in a location near the dryer for
future reference.
Install the pins after the lint blade is installed.
8

Advertisement

loading

This manual is also suitable for:

41764182300