Install The Mounting Plate; Setup Position; Drilling; Tightening The Screws - Master Chef MCO160UWF Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

A-2. Install the Mounting Plate
Step. 1 Setup position
a. Draw a line down the middle of the studs(See the Wall Construction, page 3)
b. Draw a vertical line on the wall at the center of the 30" wide space.
NOTE: Use the wall template for the rear wall.
Reference Wall Template prior to proceeding.
Installation of this product require 2 persons.
Step. 2 Drilling
Reference the Wall Template.
Step. 3 Tightening the screws
To Attach the mounting plate to the wall using the toggle bolt assemblies and/or lag screws:
a. Insert toggle bolts through mounting plate at required locations and add the spring loaded toggles.
Be sure you leave space at least the thickness of the wall between the mounting plate and the end of the toggle nut, (in closed
position). If you do not leave this space, the toggle nut will not open on the other side of the wall.
b. Position mounting plate on wall and insert toggle bolt assemblies through the drywall holes or start the lag-screw(s) through the
wall stud(s).
c. Next, secure mounting plate to the wall by tightening toggle bolt assemblies or lag screw(s).
Mounting plate
d. Drill 3/16" diameter lag screw hole(s), into one or more wall studs.
(Remember, you must have at least one lag screw into a wall stud.)For stud location refer to WALL CONSTRUCTION
see page 3
e. Tighten the lag screw(S) into wall stud(S)
Power Supply Cord Hole
House Duct
5
Mounting Plate
Space more than
wall thickness
Dry Wall

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents