Connecting
Important: If the PowerLink cable is not fully 'latched', the unit can
Disconnecting
Before removing the cable from the scanner, Metrologic recommends that the
power on the host system is off and the power supply has been disconnected
from the PowerLink cable.
1.
Locate the small 'pin-hole' on the bottom of the unit near the cable.
2.
Bend an ordinary paperclip into the shape shown above.
3.
Insert the paperclip (or other small metallic pin) into the small 'pin-hole'.
4.
There will be a faint 'click'. Pull gently on the strain-relief of the
PowerLink cable to remove the cable from the unit.
C
INK
ABLE
power intermittently.
Figure 5.
Figure 7. Releasing the PowerLink Cable
Figure 6.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents