Checklist - Payne PG9MXA Installation, Start-Up, And Operating Instructions Manual

Deluxe 4 ---way multipoise 2 ---stage condensing gas furnace sizes 060 ---120, series a
Hide thumbs Also See for PG9MXA:
Table of Contents

Advertisement

CHECKLIST—DIRECT VENT (2-PIPE) INSTALLATION
LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
____________
Roof or Sidewall
____________
Termination Kit --- 2 Pipe or Concentric
____________
Combustion-Air Pipe Length
____________
Combustion-Air Pipe Elbow Quantity
____________
Vent Pipe Length
____________
Vent Pipe Elbow Quantity
____________
Pipe Diameter Determined from Sizing Table
____________
Pipe Sloped To Furnace
Pipe Insulation
____________
Over Ceilings ________
____________
Low-Ambient Exposed Pipes
Condensate Drain
____________
Unit Level or Pitched Forward
____________
Internal Tubing Connections Free of
Kinks and Traps
____________
External Drain Connection
Leak Tight and Sloped
____________
Condensate Trap Primed before Start-Up
____________
Heat Tape Installed if Required
CHECKLIST - - START-UP
____________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
____________
Temperature Rise Adjusted
Thermostat Anticipator
____________
Anticipator Setting Adjusted or
____________
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
____________
Primary Limit
____________
Pressure Switch
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents