Schaefer ZUBRI Z1-12 Assembly Instructions

Hide thumbs Also See for ZUBRI Z1-12:

Advertisement

1. Attach Legs
Snap legs in place.
2. Attach Reflector
Remove reflector from case.
Attach reflector onto
threaded rod.
Fold over special catch,
securing reflector (Or place
wing nut on the top and
tighten).
3. Propane Tank
Hang propane tank using bracket provided.
Attach hose to propane tank, tighten securely.
Heater is now stabilized.
4. Attach Skirt
Wrap skirt around heater legs to cover propane tank.
Zip up and secure with velcro closure.
5. Light & Enjoy!
Turn on gas at propane tank.
Hold match under burner head.
Push and turn gas control knob to middle position.
After heater lights, hold down control knob for
15 seconds, release slowly and adjust heat.
Zubri Patio Heater

Assembly Instructions

From this.....To this... In 5 Easy Steps
• Easy Storage
• Easy to Transport
• Easy to Carry
www.schaeferfan.com
1-800-779-3267
©2005 Schaefer Ventilation Equipment

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZUBRI Z1-12 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Schaefer ZUBRI Z1-12

  • Page 1: Assembly Instructions

    Turn on gas at propane tank. • Hold match under burner head. • Push and turn gas control knob to middle position. • After heater lights, hold down control knob for 15 seconds, release slowly and adjust heat. www.schaeferfan.com 1-800-779-3267 ©2005 Schaefer Ventilation Equipment...
  • Page 2 ZUBRI Z1-12 PATIO HEATER Phone toll free: 1-800-779-3267 for assistance. Safety Guide 1. Your Zubri heater is designed for use with a 20 lb. LP cylinder. No other size is recommended. 2. Storage of your Zubri heater indoors is only permissible if the gas cylinder is disconnected and removed from the appliance.

Table of Contents