Download Print this page

Track Assembly - Little Tikes Tumble train Instructions

Advertisement

LINKING TRACK SECTIONS
TABS
B.
RAIL EDGES
1. Place A over B, then press together to snap tabs firmly into openings.
NOTE: Rail edges must line up.
2. Track sections correctly linked together.

TRACK ASSEMBLY

1. Connect 4 pieces of Curved Track (B) and 1 piece of Short Track (D) as shown.
Repeat with remaining 4 Curved Track pieces and 1 Short Track for a second Curve.
2. Connect 4 pieces of Straight Track (C) as shown. Repeat with 4 remaining
Straight Track pieces for a second Straight Track section.
NOTE: When disassembling unit for storage, squeeze tabbed portion of track to release tabs from openings.
IMPORTANT: To maintain track for optimal performance, always disassemble and store after use.
4
OPENINGS
A.
RAIL EDGE LIP
TRACK ASSEMBLY CONTINUED
STRAIGHT
STRAIGHT
SECTION
SECTION
CURVED SECTION
CURVED SECTION
3. Snap pre-assembled Straight Track sections and pre-assembled Curved
Track sections together by alternating curved sections with straight
sections as shown.
SIDE VIEW
5

Hide quick links:

Advertisement

loading