Power Train; Sheave Offset Adjustment - Yamaha RX10RTL Supplemental Service Manual

Hide thumbs Also See for RX10RTL:
Table of Contents

Advertisement

SHEAVE OFFSET ADJUSTMENT

POWER TRAIN

SHEAVE OFFSET ADJUSTMENT
1. Measure:
• Sheave offset
Use the sheave gauge.
Out of specification → Adjust.
NOTE:
NOTE:
Push the secondary sheave toward the inside
of vehicle frame first and measure the sheave
offset.
2. Adjust:
• Sheave offset
Adjustment steps:
• Apply the brake to lock the secondary
sheave.
• Remove the bolt (Secondary sheave)
washer
• Adjust the sheave offset by adding or remov-
ing shim(s)
Adding shim → Offset is increased.
Removing shim → Offset is decreased.
• Install the secondary sheave, bolt (secondary
sheave) and washer.
• Recheck the sheave offset. If out of specifica-
tion, repeat the above steps.
NOTE:
NOTE:
When adjusting the sheave offset, the second-
ary sheave free play (clearance) should be
adjusted.
14
INSP
Sheave offset:
13.5 ~ 16.5 mm (0.53 ~ 0.65 in)
Sheave gauge:
YS-42421-1
and secondary sheave
.
Shim size
Part Number
90201-252F1
0.5 mm (0.02 in)
90201-25527
1.0 mm (0.04 in)
90201-25289
1.6 mm (0.06 in)
90201-25526
2.0 mm (0.08 in)
Bolt (secondary sheave):
64 Nm (6.4 m•kg, 46 ft•lb)
ADJ
,
.
Thickness

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx10rslRxw10lRx10mlRx10rtrlRx10rlRx10gtl

Table of Contents