Baxi Platinum Combi 24 Installation And Service Manual page 19

Gas fired wall mounted condensing combination boiler
Hide thumbs Also See for Platinum Combi 24:
Table of Contents

Advertisement

iii) Termination to a drain or gully
Boiler
iv) Termination to a purpose made soakaway
Further specific requirements for soakaway
design are referred to in BS 6798.
Boiler
v) pumped into an internal discharge branch
Sink
Boiler
Condensate Pump
© Baxi Heating UK Ltd 2015
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
500mm min
Holes in the soak-away must
face away from the building
(e.g. sink waste) downstream of the trap
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
Basement or similar
(heated)
vi) pumped into an external soil & vent pipe
Unheated Location
(e.g. Garage)
Boiler
7.0 Site Requirements
7.7
11. When discharging condensate into a soil stack or waste
pipe the effects of existing plumbing must be considered. If soil
pipes or waste pipes are subjected to internal pressure
fluctuations when WC's are flushed or sinks emptied then
back-pressure may force water out of the boiler trap and
cause appliance lockout.
12. A boiler discharge pump is available, 'MULTIFIT'
part no. 720648301. This pump will dispose of both
condensate & high temperature water from the relief valve. It
has a maximum head of 5 metres. Follow the instructions
supplied with the pump.
13. Condensate Drain Pipe 'Trace Heating' Elements are
available in various lengths. 'MULTIFIT' part nos.:-
1 metre 720644401
2 metre 720664101
3 metre 720664201
5 metre 720664401*
*Where the drain is between 3 & 5 metres a 5 metre kit can
be used and "doubled back" upon itself.
14. It is possible to fit the element externally on the
condensate drain or internally as detailed in the instructions
provided.
15. The fitting of a 'Trace Heating' Element is NOT a substitute
for correct installation of the condensate drain. ALL
requirements in this section must still be adhered to.
Boiler
Basement or similar
(heated)
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
Condensate Pump
Condensate Drain (cont.)
vii) to a drain or gully with extended
external run & trace heating
The 'Trace Heating' element
must be installed in accordance
with the instructions supplied.
External runs & those in
unheated locations still require
insulation.
19