Topping Up The Heating System Water - Bosch Greenstar ZBR16-3A Operating Instructions Manual

Gas condensing boiler
Hide thumbs Also See for Greenstar ZBR16-3A:
Table of Contents

Advertisement

Preparing the appliance for operation | 15
3.3

Topping up the heating system water

Topping up the heating system water is different on every system.
Therefore, you should ask a trained and certified heating
contractor to show you how it is done.
Maximum pressure of 30 psi (2.07 bar) at maximum heating
water temperature must not be exceeded (safety valve will spill).
6 720 644 013 (2011/02)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zbr28-3aZbr35-3aZwb28-3aZbr42-3aZwb42-3a

Table of Contents