Lang CLB36-1-400V Installation And Operation Instructions Manual

Electric cruise line single broiler w/ cabinet base

Advertisement

Quick Links

Electric Cruise Line
Single Broiler
w/ Cabinet Base
CLB36-1-400V
CLB36-1-440V
Installation and
Operation
Instructions
2M-W1256 Rev. A 1/2/2009
CLB36-1-440V


Advertisement

Table of Contents
loading

Summary of Contents for Lang CLB36-1-400V

  • Page 1 Electric Cruise Line Single Broiler w/ Cabinet Base CLB36-1-400V CLB36-1-440V Installation and Operation Instructions 2M-W1256 Rev. A 1/2/2009 CLB36-1-440V...
  • Page 2 SAFETY SYMBOL These symbols are intended to alert the user to the presence of important operating and maintenance instructions in the manual accompanying the appliance. RETAIN THIS MANUAL FOR FUTURE REFERENCE NOTICE Using any part other than genuine Star factory supplied parts relieves the manufacturer of all liability.
  • Page 3: Table Of Contents

    TABLE OF CONTENTS CHAPTER PAGE 1. TABLE OF CONTENTS ................3 2. READ FIRST ....................4 3. UNPACKING....................6 4. INSTALLATION ................... 7 5. INITIAL START-UP..................8 6. OPERATION....................8 7. CLEANING....................9 8. TROUBLESHOOTING ................. 10 9. PARTS LISTS ....................11 10.
  • Page 4: Read First

    IMPORTANT READ FIRST IMPORTANT CAUTION: THE BROILER WEIGHS 370 LBS. (167.83 kg). FOR SAFE HANDLING, INSTALLER SHOULD OBTAIN HELP AS NEEDED, OR EMPLOY APPROPRIATE MATERIALS HANDLING EQUIPMENT (SUCH AS A FORKLIFT, DOLLY, OR PALLET JACK) TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO THE PLACE OF INSTALLATION.
  • Page 5 WARNING AND FOLLOW THE DIRECTIONS ON THE LABEL OF THE CLEANER TO BE USED. NOTICE: Service on this, or any other, LANG appliance must be performed by qualified personnel only. Consult your authorized service station directory or call the factory at 1-800-807-9054, or WWW.STAR-MFG.COM for the...
  • Page 6: Unpacking

    15 days of delivery. All packing material should be kept for inspection. Do not return damaged merchandise to Lang Manufacturing Company. File your claim with the carrier.
  • Page 7: Installation

    Wire size information can be found on the data plate. 4.2 Broiler Voltage The Lang Model CLB36-1 operates on 400 or 440 Volts, depending on what voltage the unit is designed to handle. See nameplate for unit’s voltage.
  • Page 8: Initial Start-Up

    INITIAL START UP 5.1 PRE-POWER ON Initial Start-up Before the initial use of the broiler, the unit must be wiped down thoroughly with a dry rag, to remove any oils used in manufacturing. Also the unit must be thoroughly allowed to dry itself out. This is done be setting the thermostat to 350°. Allow the range oven to heat until all vapor and condensation has been eliminated.
  • Page 9: Cleaning

    CLEANING 7.1 After each Meal Cleaning WARNING: KEEP WATER AND SOLUTIONS OUT OF CONTROLS. NEVER SPRAY OR HOSE CONTROL CONSOLE, ELECTRICAL CONNECTIONS, ETC. CAUTION: MOST CLEANERS ARE HARMFUL TO THE SKIN, EYES, MUCOUS MEMBRANES AND CLOTHING. PRECAUTIONS SHOULD BE TAKEN TO WEAR RUBBER GLOVES, GOGGLES OR FACE SHIELD AND PROTECTIVE CLOTHING.
  • Page 10: Troubleshooting

    Product burning Product is cooked too long 9.2 TESTS NOTICE: Service on this, or any other, LANG appliance must be performed by qualified personnel only. Consult your authorized service station directory or call the factory at 1-800-807-9054, or WWW.STAR-MFG.COM for the service station nearest you.
  • Page 11: Parts Lists

    PARTS LIST CLB36-1-400V & CLB36-1-440V Fig No. Part No. Description Body J9-CLB-226 PAN - BROILER 1M-72602-04 GSKTTPEHITMP1/2X1/16X10YD J9-CLB-225 SWITCH PANEL - CLB 2E-30304-32 SWT 2 HEAT 25 AMP, comes with #36 J9-CLB-319 RACK ADJUSTMENT - BROILER 2C-20111-09 SCRW HXHD CAP 10-32X1/2...
  • Page 20 STAR MANUFACTURING 10 Sunnen Drive, St. Louis, MO 63143 U.S.A. (800) 807-9054 (314) 781-2777 Parts & Service (800) 807-9054 www.star-mfg.com...

This manual is also suitable for:

Clb36-1-440v

Table of Contents